Auto Alignment

enter

8.7%      67%  103% A

X+0.00°

       Y+0.00°

Stage four, auto-alignment

Having received an AQ reading of over 100% in manual mode press enter to exit manual and enter 
again to go into auto alignment mode.  

Auto Alignment is an automatic process that will firstly reduce the RX Sense and IR Power to 
accommodate the best settings for the ZetaBeams environment.
The ZetaBeam will automatically align to the centre of the reflector, you will notice the X and Y 
axis moving as the ZetaBeam moves up, down, left and right to find the centre point.

When finished the ZetaBeam will state Ailgn Complete and pressing the Enter to confirm will 
show Air Quality 100% Status Normal.                

CAUTION: This process should take up to 10 minutes, if the ZetaBeam does not complete after 
this time then look at the X and Y axis to check it has not deviated off the reflector onto an 
obstruction. The X and Y figures should be below 1.50 on each axis and would normally be below 
0.90. If this is not the case you may need to start the Manual Alignment process again to return 
both the zetabeam axis to 0.00 and identify and remove the obstruction.

Air Quality 100%

Status - NORMAL

Step 4 testing

1. The ZetaBeam should now be tested for Fire and Fault.

The ZetaBeam must be tested at the reflector end and not at the ZetaBeam
head. This is to confirm it is looking at the reflector and completes the
commissioning process.

      

FAULT - Cover the reflector within 1 second with a non reflective card to    

      simulate a fault such as a fork truck breaking the path of the ZetaBeam. After 
     10 seconds the ZetaBeam should register FAULT and the Amber light will flash.

2. FIRE - Cover the reflector slowly up to 70% with a non reflective card to

simulate a fire such as smoke entering the path of ZetaBeam. After 10 seconds
the ZetaBeam should register FIRE and the Red light will flash.

Once you have successfully completed both tests your ZetaBeam is commissioned.
You can now fine tune your beam to suit the environment if needed. Look through the 
following menus to see adjustments that can be made.

Summary of Contents for Zeta Beam

Page 1: ...The ZetaBeam Protection System Xtra User Guide 0150 01...

Page 2: ...rt range mask supplied on the single reflector 7 to 70 metres the standard ZetaBeam The standard ZetaBeam comes boxed with the head unit low level controller key and quick start installation guide thi...

Page 3: ...t along its entire axis Note Careful design consideration should be made when positioning beams and reflectors in environments that can be susceptible to condensation i e warehouses near to water that...

Page 4: ...ction is not made ERROR will appear on the controller this connection can be checked by reading the resistance across the black and grey terminals they will read 110 ohm if OK or 220 ohm if not connec...

Page 5: ...To re panel To controller EOL FIRE Fire LED Auxiliary no relay contact 2A 30Vdc used for External LED switching no c nc no c nc fault fire controller interface external reset fire technical support 44...

Page 6: ...ne beam To controller Beams 1 2 3 To controller To re panel no c nc no c nc fault fire controller interface external reset fire technical support 44 0 1582 608000 manufactured by Lemtronics Sdn Bhd Ph...

Page 7: ...raw it may be necessary to use normal mode to prevent excessive current draw Fast mode allows x4 times faster motor response and it may be quicker to commission each beam in turn Once commissioning is...

Page 8: ...ill assume it has found the far wall You will need to identify and move the obstruction or reconsider the positioning of the ZetaBeam You can identify that the beam is obstructed by the right hand fig...

Page 9: ...the angle of the beam Y until you receive an AQ of over 100 Re ector is lower than the beam head use Y to bring the beam onto the re ector Beam head Re ector y x x y Manual AQ 125 X 0 000 Y 0 000 Manu...

Page 10: ...and would normally be below 0 90 If this is not the case you may need to start the Manual Alignment process again to return both the zetabeam axis to 0 00 and identify and remove the obstruction Air Q...

Page 11: ...ding the resistance across the black and grey terminals if connected it should read 110ohms if not connected at one end this will read 220ohms This screen will appear when the beam is performing a sel...

Page 12: ...o return signal is received the beam will reach full power and the screen will say Pre Align complete If you don t receive high enough output power and receiver sensitivity readings this will usually...

Page 13: ...uto reset The beam is factory set to auto reset when the received signal raises above the fire threshold hysteresis This can be set to latching if your system requires this Change by using the right a...

Page 14: ...before it returns to normal This action prevents small fluctuations in returned signal causing the beam to fall in and out of a fire state This can be adjusted between 1 and 40 by using the right and...

Page 15: ...g needs to be maintained in the beam path use the right and left keys to turn the system on and off This will show as a fault on the panel Press enter to return to beam maintenance 5 Press enter to go...

Page 16: ...s Electrical Specifications Supply Voltage 12 to 30 VDC Supply Current 3 5mA constant current in all operational states Constant Current 17mA constant current in fast commissioning Environmental Speci...

Reviews: