BNP
®
65 and 220 SUCTION BLAST CABINETS
Page 25
© 2019 CLEMCO INDUSTRIES CORP.
www.clemcoindustries.com
Manual No. 21309, Rev. J 01/19
secure it at the seam and an inch or two from the top
and bottom at each quadrant.
Remove the clamps
after the liner is secured.
7.9.17
(5th) Remove the temporary baffle bolts and
install the inlet baffle by inserting bolts and flat washers
from the inside of the reclaimer and then attach lock
washers and nuts from the outside, leaving the baffle
slightly loose.
7.9.18
Apply silicone caulking on seams between the
cone ring and cone liner to the seams on the cone ring
and cone, between the cone liner and wall liner, and the
seam on the wall liner. Wipe caulking to even with the
liners. Voids will cause premature wear.
NOTICE
All seams between each liner must be sealed,
and all seams between the liners and reclaimer
weldment must be sealed. Voids will cause
premature wear.
7.9.19
(6th) Use self-drilling screws through the existing
holes to secure the inlet-side liner to the side of the inlet
housing. NOTE: To field install new, first-time inlet-side
liners, use self-drilling screws at each liner corner to
secure. Remove the clamps after the liner is secured.
Figure 29
7.9.20
(7th) Align the front edge of the inlet-top liner to
the front of the inlet housing and use self-drilling screws
through the existing holes to secure. NOTE: To field
install new, first-time inlet-top liners, after clamping the
liners, use self-drilling screws at each liner corner to
secure. Remove the clamps after the liner is secured.
7.9.21
(8th) Slide the top liner onto the inner tube and
align the holes in the liner with those in the top. Note that
the holes around the inlet are spaced differently from the
others. Temporarily install a couple of bolts to keep it in
alignment.
7.9.22
(9th) Place the cylinder liner over the inner tube.
Make sure the liner is tight against the top liner and use
worm clamps to temporarily clamp the liner to the tube.
Tack weld the bottom of the cylinder liner to the inner
tube in three or four places. Remove the clamps when
the cylinder liner is secured.
7.9.23
Apply caulking to the seam on the cylinder liner
and between the cylinder liner and top liner.
7.9.24
Apply caulking around the top edge of the wall
liner and top-inner edge on the inlet housing.
7.9.25
(10
th
) Align the reclaimer top assembly over the
top of the reclaimer and lower it into place to match the
mating holes in the flange, being careful not to smear
the caulking. Secure the top bolts and inlet baffle bolts.
7.9.26
Working through the reclaimer inlet, wipe the
caulking seal smooth. Re-caulk any voids.
7.9.27
Working through the reclaimer inlet, apply
silicone caulking to seal seams around the inlet-side
liner, inlet-top liner, and reclaimer weldment. Wipe the
caulking smooth.
7.9.28
Attach the inlet-pipe adaptor, replacing the
gasket if worn, compressed, or otherwise damaged.
7.9.29
If the lower flange gasket (usually installed on
the hopper flange) is worn, compressed, or otherwise
damaged, clean old gasket material from the flange and
install new 2" strip gasket to the reclaimer hopper flange.
7.9.30
Reattach the reclaimer body:
600 cfm: Attach the reclaimer to the cabinet and
attach hopper to lower flange
900 cfm: Attach reclaimer to hopper and leg
assembly.
7.9.31
Install flex hoses.
7.9.32
Allow time for the caulking to cure before putting
the reclaimer in service.
Reclaimer Top and
Inner Tube (10
th
)
Top Liner (8
th
)
Cylinder Liner (9
th
)
Inlet-Top Liner
(7
th
)
Lined Baffle (5
th
)
Bolts enter from
inside.
Baffle Bolts and
Flat Washers
Inlet-Side Liner
(3rd) and (6
th
)
Wall Liner (4
th
)
Self-Drill/Tap
Screws
Baffle Nuts and
Lock Washers
Cone Liner (2
nd
)
Cone-Ring Liner (1
st
)
Some items are rotated or removed for clarity.
900 cfm reclaimers are mirrored.