Plumbing • 27
PLUMBING
Booster Pump Installation
Instructions for installing a booster condensate pump system for a Reveal Merchandiser
®
display case as a Hybrid Merchandiser
™
.
This system moves condensate from the display case to an overhead drain instead of a floor drain or evaporation pan.
1. apply PVC primer and PVC adhesive to the drain lateral and elbow and attach them to the drain elbow under the case.
2. Place the 1' length of vinyl tube over the inlet to the main condensate pump. Fasten into place using the hose clamp.
3.
Connect the vinyl tube to the PVC pipe and set the main condensate pump on the floor. The tubing must form a drain trap.
Add Vinyl Tubing to Pump Inlet
Hose Clamp
Main Condensate Pump Assembly
PVC Piping to
Case Drain
Tubing Must Form a Drain Trap
Main Condensate
Pump
Booster Condensate Pump (Alternative)
Booster Pump
Inlets
Piping to Store's
Overhead Drain
Booster Condensate Pump (U-Shaped Copper Pipe)
Booster Pump
Inlets
Piping to Store's
Overhead Drain
U-Shaped Copper Pipe
Parts Required:
Booster Condensate Pump
Hose clamp
Main condensate pump
PVC drain lateral
PVC elbow
Screws & P-Clips
U-shaped copper pipe
Vinyl Tubing
4. Find the 16' length of vinyl tubing shipped separately with the main condensate pump kit. Route the vinyl tubing from the top of the case,
down the back, under the case, and attach it to the main pump outlet.
5. attach the U-shaped copper pipe to the top end of the 16' length of vinyl tubing, and hang this tubing into one of the inlets of the booster
condensate pump. alternatively, the vinyl tube can be inserted without the U-shaped copper pipe, but make sure that the tubing dips far
enough in to be submerged when condensate collects inside the booster pump's internal tank.
6. attach the 45' length of vinyl tubing to the outlet of the booster pump. Route the tubing to the overhead drain in the store.