ZEP SYSTEM II INSTALLATION MANUAL
4. Install the Leveling Feet along the top of
the row according to the design drawings
and rest it on the roof or attachment hard-
ware. Check that the Module is seated onto
the Zep tongues at the desired location. If
there is a gap that is not needed to take up
tolerances (Figure 5.10G), lift the Module
to 15° and re-seat while applying pressure
towards the Zeps.
Figure 5.10G
5.11 > Installing Additional Rows
1. Continue to install the remaining Modules in the new row using the “Drop in and Pivot Lock
Procedure” (Section 5.10) and attach all Leveling Feet (Section 5.7) according to design drawings.
2. Once all Modules and Leveling Feet have been installed in the row, attach the Leveling Feet to
the roof attachment hardware or directly to the roof using appropriate hardware and then level
the row as needed (Section 5.9).
Figure 5.11A
— Full Module Array