ZDK 250 135/155
Testing and verification
63
www.zepro.com
11.2
Dynamic load test.
11.2.1
Test with max. load
• Place a test load on the platform, as shown in table (for each lift model/lift capacity).
• Check that the lift operates correctly in the normal range of movement, i.e. up, down, tilting at ground
level and tilting at vehicle floor level.
11.2.2
Test with overload
• Place a test load on the platform, as shown in table (for each lift model/lift capacity).
• The test load should be 1.25 x the lift model’s max. load. Verify that the tail lift cannot lift the load when
the up function is switched on (it may however be possible to tilt up the load).
11.2.3
Dynamic load (Test load 1.0 x tail lift loading capacity).
For tail lifts with a load centre of 1000 mm.
Capacity
Load 1500 kg
Load 2000 kg
Distance out on platform (L)
1500 kg
1000 mm
-
2000 kg
1300 mm
1000 mm
11.3
Test of safety functions
The tail lift functions must be tested.
Check:
• That the red lamp in the vehicle’s driver's cab goes out when the platform is fully closed against the body,
and conversely, that it comes on when the platform opens.
•
That the tail lift cannot be activated if the cabin switch is in the off position.
• That the tail lift cannot be activated when the main switch fuse is removed.
•
That the overflow valve is activated when the lift is operated up to the vehicle floor level or end stops.
• That the tail lift cannot be lowered or tilted down if the electrical connector from the electric hose rupture
valves is disconnected from the lift and tilting cylinders respectively.
• That the max load sticker is present and suitably positioned in relation to the load diagram for the lift
model concerned.
•
That warning flags and reflectors are fitted and fulfil their function correctly.
•
That all safety and operating stickers are affixed in their respective positions.
• That the platform's mechanical locking device is working (if accessible).
• That the instructions for using the tail lift have been left in the driver’s cab.
• That the CE declaration of conformity has been completed.