ZDK 250 135/155
40
Connection
www.zepro.com
6
Connection
6.1
Cable grommet
6.1.1
Before connection
1. Disconnect the cable grommet’s protective cover, which is secured with three screws; see Image 69.
2.
Loosen the five screws on the cable grommet, see
Image 70. Cables can now be installed/removed/
adjusted in the grommet. The cable should be installed together with existing cabling using cable ties. En-
sure the length of the cable is sufficient. The outer casing should be stripped back 350 mm. See
Image 71.
6.1.2
After connection
1.
Tighten the five screws once all cables are suitably located in the cable grommet, see
Image 70.
Tightening torque: 5 Nm.
2. Install the cable grommet’s protective cover with the three bolts provided, see Image 69.
Tightening torque: 8 Nm.
Image 69. Fasten the cable grommet’s
protective cover with three screws
350 mm.
Image 70. Cable grommet's five screws
Image 71. The outer casing of cables should be stripped 350 mm.
Summary of Contents for ZDK 250 135
Page 2: ......
Page 65: ...ZDK 250 135 155 Registration 65 www zepro com...