![background image](http://html2.mh-extra.com/html/zenoah/bt250/bt250_owners-manual_3409564018.webp)
18
6. Set up
English
■
INSTALLING HANDLE (SE1)
• Mount the handle to the shaft tube and clamp it at
your best operating position.
■
INSTALLING DEBRIS GUARD (SE2)
• This model pack with already installing debris guard.
• Put the debris guard on the shaft tube near the gear
box, attach it with the screw, washer and nut
provided.
■
INSTALLING CUTTING HEAD (SE3)
1. While locking the gear shaft by inserting the
attached bar into the upper holder and the housing.
2. Rotate the cutting head to engage threads. Hand-
tighten it securely.
SE1
SE2
SE3
Summary of Contents for BT250
Page 35: ...35 8 11 14 1 2 9 10 12 13 15 THIS SIDE UP THIS SIDE UP WIND LINE 9 Maintenance...
Page 44: ...44 Fig 1 DRIVE UNIT BT250 S N 40400101 and up 13 Parts list...
Page 46: ...46 13 Parts List Fig 2 ENGINE UNIT BT250 S N KU40001 and up...
Page 51: ......
Page 52: ...Printed in U S A ZENOAH AMERICA INC 1100 Laval Blvd Suite 110 Lawrenceville Georgia 30043...