ZENN
iO
AVANCE Y TECNOLOGÍA
www.zennio.com
7
Communication Cable
:
2-wire cable, direct to PI/P2 connectors that can be
found at the PCB of the internal unit, or in the wired remote control.
Besides including the programming red LED (typical in any KNX device), the KLIC-
DI incorporates two more LEDs, blue and green ones, in order to inform about the
bidirectional communication between KNX and Daikin, resulting very useful in the
installation process.
Nº
Description
1
EIB
connector
2
Programming LED
3
Programming button
4
2-wire communication terminal