Installation instructions

General information

Read these instructions carefully right up to the 
end before starting to mount the device!
The installation has to be done by qualified pro-
fessional personnel. The current laws and regu-
lations have to be observed, especially EN1434 
part  1+6,  (in  Germany  also  AGFW  directive 
FW202, FW510, FW218 and DIN4713 part 4 and 
the  initial  verification  directive). At  devices  with 
M-Bus  the  general  rules  of  technology  and  the 
respective regulations for electrical installations 
have to be followed.

Make sure no heating water escapes during in-
stallation – 

this can cause burns!

The maximum heating water temperature at the 
flow sensor may not exceed 90ºC.
For heating systems with a lack of temperature 
mixing resp. with temperature stratification a
straight pipeline of min. 10xDN has to be pro-
vided upstream of the meter. It is important to 
ensure adequate system pressure to avoid cavi-
tation.
To mount the heat computer of the C5-ISF in 
combi version on the wall, the supplied mounting 
adapter has to be used. The review of the ap-
proval can be identified definitely in the display 

menu  (Level  3).  ZENNER  recommends  to  use 
direct temperature measurement and not to use 
immersion sleeves.

Notes to installation of the flow sensor 
(VMT)

 

Mount ball valves up- and downstream of the 
VMT.

 

Consider  the  correct  installation  point  (sup-
ply or return). Normally this is the return pipe 
(cooler pipe at heating systems). Please note 
the type plate information.

 

Consider the correct flow direction. This is indi-
cated by an arrow on the side of the VMT.

 

Install horizontally or vertically only, not tilted, 
inclined or overhead. Installation into horizon-
tal or upstreaming or downstreaming pipelines.

 

Do not install at highest point of piping to avoid 
air inside the flow sensor.

 

Consider the dimensions of the heat meter.

 

Keep about 1 meter distance between zelsius

®

 

C5-ISF and electromagnetic sources of inter-
ference like switch cabinets, motors or pumps. 
Keep  about  0.2  m  distance  to  power  cables. 
Keep min. 3 cm free mounting space around 
the device.

Summary of Contents for zelsius C5-ISF

Page 1: ...lsius C5 ISF Installation and operating manual electronic compact heat meter with single jet flow sensor ISF M Bus wM Bus and 3 inputs outputs optional qp 0 6 1 5 2 5 m3 h EnergyMetering All that coun...

Page 2: ...to use After this the national regulations for devices subject to com pulsory verification apply within the EU The duration of initial verification validity in Ger many remains 5 years for heat meters...

Page 3: ...tance To avoid malfunctions due to other interfer ences do not install fluorescent lamps switch cabinets or electric devices such as motors or pumps in the immediate vicinity of the meter minimum dist...

Page 4: ...radio Supply 3 6 V lithium battery different capacities Battery lifetime Years 6 opt 11 changeable during the operation time Protection class IP54 EMC C Ambient conditions climatic influencing valid...

Page 5: ...signification brown M Bus 1 M Bus Line 1 white M Bus 2 M Bus Line 2 Compact version Combiversion E H1 H2 25mm Dimensions Height compact version Hmax 55 mm Emax 21 mm Height combiversion H1 H2 Hmax 65...

Page 6: ...eline of min 10xDN has to be pro vided upstream of the meter It is important to ensure adequate system pressure to avoid cavi tation To mount the heat computer of the C5 ISF in combi version on the wa...

Page 7: ...temperature sensor The installation of the temperature sensors should be preferably symmetrical and direct installation Do not remove the return sensor if already mounted in the VMU This is also vali...

Page 8: ...ntegrated in the flow sensor Supply Return Consumer Symmetrical sensor installation for zelsius C5 ISF Supply Return Consumer Asymmetrical sensor installation for zelsius C5 ISF with the return sensor...

Page 9: ...eck sensors 2 Temperature out of measuring range Check sensors 3 Short circuit return sensor Check sensors 4 Interruption return sensor Check sensors 5 Short circuit supply sensor Check sensors 6 Inte...

Page 10: ...3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 1 1 3 Function only available in variant zelsius C5 Glycol Meter 2 S S S S H H H H 1 3 1 3 1 3 3 3 1 2 3 4 1 1 water glycol mixtures 1 1 1 1 Heat energy Main disp...

Page 11: ...rtification model Firmware version ing energy ing energy power since commissioning Function Output 3 Function Output 2 Function Output 1 Opto readout energy Pulse value Input 1 Pulse value Input 2 Pul...

Page 12: ...or other accessories are disposed Therefore please contact the department of your local authority which is responsible for waste disposal Alternatively a waste disposal via ZENNER is possible Your loc...

Reviews: