background image

7

Notes ball valves

 

Mount ball valves up- and downstream of the 
meter.

 

Mount a ball valve with bore M10x1 for direct 
sensors in the supply. This is required for the 
installation of the supply sensor

 

For symmetrical temperature sensor installa-
tion, mount an identical ball valve in the return.
This one is used for mounting the return sensor. 

Mounting heating- / cooling energy meter 

 

Flush the system thoroughly before installing 
the heating-/cooling energy meter.

 

Close valves and release pressure.

 

Dismount the existing flow sensor or meter blank.

 

Use only new and flawless sealing material 
and check the seal face for damage.

 

Install the new flow sensor according to the 
correct flow direction and installation position.

 

Turn heat computer to desired reading position.

Information:

 The best measuring results can be 

achieved by mounting with horizontal diallevel. 
Combi-devices are, for example, used in tight 
installation points without room for the calculator 
on the flow sensor or when the calculator is dif-
ficult to read. Therefore the device still remains 

easy to read enabling optimum use of the space 
available for installation of the flow meter.

Installing the temperature sensor

 

The installation of the temperature sensors 
should be preferably symmetrical and direct 
installation.

 

Do not remove the return sensor if already 
mounted  in  the  VMU.This  is  also  valid  for  all 
the safety seals which are mounted on the de-
vice as standard.

 

Sensors are colour-coded (red = supply, blue 
= return).

 

The connecting cables may not be buckled, ex-
tended or shortened.

 

The seal at the sensor installation point on the 
measuring capsule may not be damaged.

 

Remove locking screw and seal at the ball 
valve completely, if existing.

 

Attach the O-ring to the installation aid (the 2nd 
O-ring is only a spare O-ring).  

 

Using the installation aid, insert the O-ring into 
the installation point according to DIN EN 1434 
with a slight circular motion.   

 

Using the other end of the installation aid bring 
the O-ring into the correct position.  

 

Insert the 2 halves of the plastic connector into 
the sensor’s three notches (crimps) and press 
them together.

 

Use the installation aid as positioning aid.

 

Insert the temperature sensor into the installa-
tion point and screw it in tightly until the dead 
stop of the seal on the 12-point is reached 
(mounting torque 3-5 Nm).

 

The sensor optional integrated in the VMT has 
to be secured

 

Secure the sensor after installation against 
unauthorised removal with appropriate sealing 
(available as a sealing set). 

Montage DF- Adapter

Summary of Contents for zelsius C5-ISF

Page 1: ...lsius C5 ISF Installation and operating manual electronic compact heat meter with single jet flow sensor ISF M Bus wM Bus and 3 inputs outputs optional qp 0 6 1 5 2 5 m3 h EnergyMetering All that coun...

Page 2: ...to use After this the national regulations for devices subject to com pulsory verification apply within the EU The duration of initial verification validity in Ger many remains 5 years for heat meters...

Page 3: ...tance To avoid malfunctions due to other interfer ences do not install fluorescent lamps switch cabinets or electric devices such as motors or pumps in the immediate vicinity of the meter minimum dist...

Page 4: ...radio Supply 3 6 V lithium battery different capacities Battery lifetime Years 6 opt 11 changeable during the operation time Protection class IP54 EMC C Ambient conditions climatic influencing valid...

Page 5: ...signification brown M Bus 1 M Bus Line 1 white M Bus 2 M Bus Line 2 Compact version Combiversion E H1 H2 25mm Dimensions Height compact version Hmax 55 mm Emax 21 mm Height combiversion H1 H2 Hmax 65...

Page 6: ...eline of min 10xDN has to be pro vided upstream of the meter It is important to ensure adequate system pressure to avoid cavi tation To mount the heat computer of the C5 ISF in combi version on the wa...

Page 7: ...temperature sensor The installation of the temperature sensors should be preferably symmetrical and direct installation Do not remove the return sensor if already mounted in the VMU This is also vali...

Page 8: ...ntegrated in the flow sensor Supply Return Consumer Symmetrical sensor installation for zelsius C5 ISF Supply Return Consumer Asymmetrical sensor installation for zelsius C5 ISF with the return sensor...

Page 9: ...eck sensors 2 Temperature out of measuring range Check sensors 3 Short circuit return sensor Check sensors 4 Interruption return sensor Check sensors 5 Short circuit supply sensor Check sensors 6 Inte...

Page 10: ...3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 1 1 3 Function only available in variant zelsius C5 Glycol Meter 2 S S S S H H H H 1 3 1 3 1 3 3 3 1 2 3 4 1 1 water glycol mixtures 1 1 1 1 Heat energy Main disp...

Page 11: ...rtification model Firmware version ing energy ing energy power since commissioning Function Output 3 Function Output 2 Function Output 1 Opto readout energy Pulse value Input 1 Pulse value Input 2 Pul...

Page 12: ...or other accessories are disposed Therefore please contact the department of your local authority which is responsible for waste disposal Alternatively a waste disposal via ZENNER is possible Your loc...