background image

Installation manual

General information

With zelsius

®

 C5-ISF you have acquired one of 

the most up-to-date, modern heat meters cur-
rently available on the market. 

Expressive symbols in the display and easy 
menu navigation make readout simple. Can be 
operated with one single button. It is equipped 
with a long-life battery made for operation dur-
ing the initial verification validity period (5 years) 
including a reserve of at least another year. The 
meter can be equipped optionally with a battery 
lifetime of 11 years.

MID - Initial verification

zelsius

®

 C5-ISF is produced and tested in 

compliance with the new European Measur-

ing Instruments Directive (MID).  According to 
this directive, devices are no longer carrying an 
initial verification stamp, but rather the year of 
the  device’s  declaration  of  conformity  (recog-
nizable on the front of the device, for example: 
M12). The MID controls the use of heat meters 
up to the moment they are placed on the market 
resp. their first putting into use. After this, the 
national regulations for devices subject to com-
pulsory verification apply within the EU.
The duration of initial verification validity in Ger-
many  remains  5  years  for  heat  meters.  After 
this period has expired the measuring device 
may no longer be used for billing in commercial 
use. 
The regulations resp. validity period may vary in 
other countries of the EU. 

2

* Standard: Ratio 25; optionally R50 but not for qp=0,6 and non-symmetrical temperature sensors installation

Technical data flow sensor ISF

Nominal flow qp

m³/h

0,6

1,5

2,5

Maximum flow qs  

m³/h

1,2

3,0

5,0

Minimum flow qi  horizontally*

l / h

12 / 24

30 / 60

50 / 100

Minimum flow qi  vertically*

l / h

12 / 24

30 / 60

50 / 100

Starting flow horizontally ca.

l/h

4

4

5

Pressure loss at qp

bar

<= 0,25 bar

Temperature range

°C

10°C <= θ

q

 <= 90°C

Minimum pressure  

(to avoid cavitation)

bar

0,3

Measurement accuracy class

3

Nominal pressure

PS/PN

16

Nominal diameter

DN

15

15

20

Installation position

horizontally or vertically, no upside down installation

Installation 

return flow optionally forward flow

Cable length up to calculator  

(in version combi)

m

1,2

Installation place temperature sensors

M10 x 1

Heat carrier (Medium)

water

Summary of Contents for zelsius C5-ISF

Page 1: ...lsius C5 ISF Installation and operating manual electronic compact heat meter with single jet flow sensor ISF M Bus wM Bus and 3 inputs outputs optional qp 0 6 1 5 2 5 m3 h EnergyMetering All that coun...

Page 2: ...to use After this the national regulations for devices subject to com pulsory verification apply within the EU The duration of initial verification validity in Ger many remains 5 years for heat meters...

Page 3: ...tance To avoid malfunctions due to other interfer ences do not install fluorescent lamps switch cabinets or electric devices such as motors or pumps in the immediate vicinity of the meter minimum dist...

Page 4: ...radio Supply 3 6 V lithium battery different capacities Battery lifetime Years 6 opt 11 changeable during the operation time Protection class IP54 EMC C Ambient conditions climatic influencing valid...

Page 5: ...signification brown M Bus 1 M Bus Line 1 white M Bus 2 M Bus Line 2 Compact version Combiversion E H1 H2 25mm Dimensions Height compact version Hmax 55 mm Emax 21 mm Height combiversion H1 H2 Hmax 65...

Page 6: ...eline of min 10xDN has to be pro vided upstream of the meter It is important to ensure adequate system pressure to avoid cavi tation To mount the heat computer of the C5 ISF in combi version on the wa...

Page 7: ...temperature sensor The installation of the temperature sensors should be preferably symmetrical and direct installation Do not remove the return sensor if already mounted in the VMU This is also vali...

Page 8: ...ntegrated in the flow sensor Supply Return Consumer Symmetrical sensor installation for zelsius C5 ISF Supply Return Consumer Asymmetrical sensor installation for zelsius C5 ISF with the return sensor...

Page 9: ...eck sensors 2 Temperature out of measuring range Check sensors 3 Short circuit return sensor Check sensors 4 Interruption return sensor Check sensors 5 Short circuit supply sensor Check sensors 6 Inte...

Page 10: ...3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 1 1 3 Function only available in variant zelsius C5 Glycol Meter 2 S S S S H H H H 1 3 1 3 1 3 3 3 1 2 3 4 1 1 water glycol mixtures 1 1 1 1 Heat energy Main disp...

Page 11: ...rtification model Firmware version ing energy ing energy power since commissioning Function Output 3 Function Output 2 Function Output 1 Opto readout energy Pulse value Input 1 Pulse value Input 2 Pul...

Page 12: ...or other accessories are disposed Therefore please contact the department of your local authority which is responsible for waste disposal Alternatively a waste disposal via ZENNER is possible Your loc...

Reviews: