5
1-800-892-3986 IS19172-I2
Step 4A -
Tension Installation
•
NOTE:
The rod should be installed with the set screws (F) on the
bottom side and the curve facing out of the tub.
•
PERSON 1:
While facing the tub hold the left mounting bracket (A) and
firmly
press against the left wall.
•
PERSON 2:
Hold the right mounting bracket (B) and
firmly
press against the right wall.
RECOMMEND
Step 4B -
Tension Installation
•
NOTE:
Make sure the rod is level and adjust if needed.
•
PERSON 2:
Secure the length of the rod by fully tightening the screws (F) with the allen wrench (E).
B
B
PUSH
PUSH
4
Person 2 tightens
end of rod B.
5
FINAL
STEP
Person 1
(LEFT)
Person 2
(RIGHT)
Extend rod fully and
apply outward pre
ssure.
Person 2 (RIGHT) tig
htens screws fully.
F
Tighten screws
on bottom.
TOP B
B
PUSH AGAINST
FLOOR
A
B
E
RECOMMEND
PERSON 1
(LEFT)
PERSON 2
(RIGHT)
PUSH
PUSH
• Twist the adjuster so the rod tightens
firmly
against the wall.
• After tightening the rod fully, insert the set screw cap (G) into the screws on the underside of rod.
RECOMMEND
Step 5 -
Tension Installation
B
B
PUSH
PUSH
4
Person 2 tightens
end of rod B.
5
FINAL
STEP
Person 1
(LEFT)
Person 2
(RIGHT)
Extend rod fully and
apply outward pre
ssure.
Person 2 (RIGHT) tig
htens screws fully.
F
Tighten screws
on bottom.
TOP B
B
PUSH AGAINST
FLOOR
G