10
1-800-892-3986 IS19172-I2
Step 6 -
Permanent Installation
•
PERSON 1:
While facing the tub, press the rod (A)
firmly
against the left side.
•
PERSON 2:
Press the rod (B)
firmly
on the right side and secure the length of the rod by tightening the
set screws (F) on the rod with the allen wrench (E).
RECOMMEND
Step 7 -
Permanent Installation
•
PERSON 2:
Twist the tube assembly so the rod tightens
firmly
against the wall.
• Once the rod assembly is secure, twist the tube until tight.
•
NOTE:
After tightening the rod fully, insert the set screw cap (G) into the screws on the underside of rod.
RECOMMEND
B
B
PUSH
PUSH
4
Person 2 tightens
end of rod B.
5
FINAL
STEP
Person 1
(LEFT)
Person 2
(RIGHT)
Extend rod fully and
apply outward pre
ssure.
Person 2 (RIGHT) tig
htens screws fully.
F
Tighten screws
on bottom.
TOP B
B
PUSH AGAINST
FLOOR
A
B
E
B
B
PUSH
PUSH
4
Person 2 tightens
end of rod B.
5
FINAL
STEP
Person 1
(LEFT)
Person 2
(RIGHT)
Extend rod fully and
apply outward pre
ssure.
Person 2 (RIGHT) tig
htens screws fully.
F
Tighten screws
on bottom.
TOP B
B
PUSH AGAINST
FLOOR
G