IMPORTANT: Submittal documentation, specific to
each project, supersedes the general guidelines
contained within this manual.
Models and arrangements
1
Ratings 3
Dimensions and data
5
General information
11
Receiving 11
Safety considerations
12
Unpacking and preparation
13
Handling and installation
14
Hot water connections
15
Ductwork connections
16
Electrical connections
17
Wiring diagram
18
Start-up 20
Air system balancing
21
Heating system
21
Water system balancing
22
Water treatment
22
Controls operation
23
Exposed unit touch-up
23
Normal operation/maintenance 24
Replacement parts
26
Equipment start-up checklist
26