background image

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 

 
 
 

 

Guidebook for installation, handling and maintenance – ENG 

Electric heater HPe2/4CM  

 

Electric heater for outdoor and indoor installation 
 
 
 
 

FU-HPe2/4CM-10/2020 

Summary of Contents for HPe2/4CM

Page 1: ...Guidebook for installation handling and maintenance ENG Electric heater HPe2 4CM Electric heater for outdoor and indoor installation FU HPe2 4CM 10 2020 ...

Page 2: ...dure for HPe2 4CM 4 4 Montage HPe2 4CM on wall 4 5 Execution of hydraulic connections 4 6 1 Installation filling with water and waterproof testing 4 6 2 Heating pump air emission and de blocking 4 6 3 Venting and installations 5 Electrical connection 5 1 Connection of HPe2 4CM to three phase mains 5 2 Connection of HPe2 4CM to mono phase mains 5 3 Connecting the power cable Safety circuit 5 4 Elec...

Page 3: ... by service authorised for electrical works Installation and commissioning Placement of device can be done only by authorised service Boiler can be turned on only if installation is with corresponding pressure level and working pressure regular Do not close security valves in order to avoid damage caused by too high pressure During warming water can leak on security valve of the hot water circuit ...

Page 4: ... operating instructions data on the nameplate and technical data Boiler should be handled only by adults who are familiar with instructions and work of the boiler Do not close safety valve Inflammatory objects must not be put on the boiler surface or close to it within safety distance Boiler surface clean only with non inflammatory products Inflammatory substances do not keep in the room for boile...

Page 5: ...2 2003 Electric devices for households EN 60 335 1 ed 2 zm A1 2005 Electric devices for households EN 61000 3 2 ed 3 2006 Electrical magnetic compatibility EMC emission limits for harmonic power EN 61000 3 3 1997 Electrical magnetic compatibility EMC Law on determination of fluctuation of voltage and frequency of low power distributive network 2 6 Tools materials and auxiliary measures Standard to...

Page 6: ...th easy and fast switching of the INFO panel from one side of the formwork to the other Table 2 Ignitable materials and composition of elements according to DIN 4102 The basic components of HPe2 4CM are Depending on valid regulations other minimum distances could be applied different than mentioned below Comply with regulations of electrical installations and minimum distances which are in force i...

Page 7: ...Input power Maximum temperature Working pressure Mass Electric power supply Protection grade Manufacturer 2 13 Transportation NOTE Transportdamages Pay attention on instructions for transportation on packaging Use adequate transportation means i e carts for bags with tighten strip The product should be in horizontal position during transportation Avoid shocks or collisions Packed HPe2 4CM put on c...

Page 8: ...Dimensions and technical data 3 Dimensions and technical data 3 1 Dimensions HPe2 4CM Image 1b Dimensions HPe2 4CM Table 3b Dimensions mm HPe2 4CM A B C D E F HPe2 4CM 620 260 220 120 390 110 ...

Page 9: ...5 Return line 6 Safety valve 3bar 7 Safety valve drain pipe 8 3 pole circuit breaker with upgraded DA10 Safety circuit 9 Signal clamps for switching on relays and connecting temperature sensors 10 Relay for switching heating group 12 Temperature sensor 13 Safety thermostat STB 14 Thermal insulation HPe2 4CM Image 2 HPe2 4CM components ...

Page 10: ...2 2 4 Network voltage VAC 1N 230V 50Hz 3N 400 230V 50Hz Ingress protection rating IP54 Main fuse required A 1 16 1 25 3 16 Min cable cross section mm 3 2 5 3 4 5 2 5 Max allowed working pressure bar 3 0 Min allowed working pressure bar 0 5 Max temperature C 80 Water volume l 4 5 Discharge line connection DN25 1 SN Return line connection DN25 1 SN Device weight without water Kg 10 5 Table 4 technic...

Page 11: ...t countries Place HPe2 4CM on the wall in such manner to leave free space as illustrated in the Image 3 4 1 Be careful prior to assembly NOTE Material damage occurred due to incompliance with further instructions Respect instructions for boiler and all installed components Prior to installing take care of the following All electrical connectors protective measures and fusses should be done by prof...

Page 12: ...cessary to use proper material for fixing This chapter describes mounting the HPe2 4CM on a wall Plot the drill hole positions for the mounting kit respecting the minimum free space dimensions next to the HPe2 4CM Image 3 and the dimensions in Table 5 Drill the holes according to the dimensions for the given type of HPe2 4CM Insert plastic dowels that are part of the device packaging or dowels ade...

Page 13: ...stallation return line of the HPe2 4CM Connect the filling hose to the water supply network and slowly fill it with water so that all the air comes out of it and the water starts to flow continuously Close the tap on the water supply network and connect the free end of the hose to the tap for filling and emptying the heating installation Secure the hose with a clamp Open the installation filling a...

Page 14: ...gulations When connecting HPe2 4CM on electric installation take care on connections scheme and connecting plans Respect mandatory diameters of cables and fusses power outside the HPe2 4CM This device is manufactured for connection to three phase power supply 3N 400 230V 50Hz Connection to a single phase network is possible with a power limit of 2kW or 4kW where the connection must be fixed no con...

Page 15: ...heater relay from the Heat Pump Table 7a Nominal current el fuses and cross section of power supplies 2kW limited power cables for mono phase power supply Image 7b Shema for connecting cable to mono phase power supply RSP1 RSP2 Temperature sensor connection terminals with heat pump RSP3 Neutral line connection clamps from Heat Pump RSP4 RSP5 Signal connection clamps 230V AC for switching on the he...

Page 16: ...operate the automatic fuses must be activated manually which must be done by a service technician after determining the cause of the overheating ATTENTION When connecting phase conductors be sure to tighten the screws in the terminal blocks well to achieve the best possible connection between the conductors and the clamps DANGER Failure to connect the conductor and clamps properly may result in ov...

Page 17: ...5 4 Electrical scheme Image 8 Electrical scheme HPe2 4CM rated power 6 kW Electric connecting ...

Page 18: ...Check all electrical connections Switch on circuit breakers protective circuit Before turn on test if the following elements and joints are connecter correctly and work correctly Watertight of heating installation All pipes connected into ducts All electric connectors 6 3 Start up log Commissioning works Measured values Notes 1 HPe2 4CM type 2 Serial number 3 Set thermostat regulation 4 Fill and a...

Page 19: ... HPe2 4CM User must comply with instructions for operating the HPe2 4CM User may only turn on the HPe2 4CM except the first start up adjust temperature on the regulating device and turn off the HPe2 4CM All other operations must be performed by authorised service Authorised person who performed installation is obliged to inform the user about handling and correct and safe work of HPe2 4CM In the e...

Page 20: ...e2 4CM can lead to damage or destruction and to loss of Warranty rights Secure regular entire and professional maintenance of heating installation Electric parts and work units protect against water and humidity Use only spare parts delivered by the manufacturer or those approved by manufacturer There will be no responsibility for damage occurred due to spare parts not delivered by the manufacture...

Page 21: ...amaged by corrosion and carbonate layers depending on water characteristics Test sealing and watertight of heating installations and expansion dish on functionality Connect hose on water faucet Fill the hose with water and connect to connector for filling draining Tighten the hose and open the water faucet for filling draining Slowly fill the heating installation while following up with pressure m...

Page 22: ... pressure set on Heating installation air vent Check safety heating valve ____________ bar ____________ bar ____________ bar 4 Clean water filter 5 Check if there is any damage on electric duct lines 6 Check if electric control connections and used elements are fitted tighten it if needed 7 Check thermo regulator on boiler 8 Check function of safety parts 9 Check remote control function 10 Check i...

Page 23: ...r to protect environment and respecting economy concepts we use only the best technique and materials Packaging Regarding packaging we respect system of recycling which is specific in certain states and which secure optimal recycling All materials applied for packaging do not harm environment and It is possible to recycle it Old devices Old devices contain valuable materials that can recycle Struc...

Page 24: ...ll power of HPe2 4CM Some relay damaged Some heater damaged Check all three phases Check set power of HPe2 4CM Change damaged part Change damaged part HPe2 4CM heats but it is very noisy Higher level of noise during work Air in the system Small water flow Possible carbonate layer on heater Check if the system is air vented and vent it Check valves below boiler and open it Clean filter below HPe2 4...

Page 25: ...perating and installation instructions Read and follow the operating and installation instructions 10 All of the data that is included in the product information was determined by applying the specifications of the relevant European directives Differences to product information listed elsewhere may result in different test conditions Only the data that is contained in this product information is a...

Page 26: ...Centrometal d o o Glavna 12 40306 MACINEC HRVATSKA Croatia tel 385 0 40 372 600 email komercijala centrometal hr ...

Reviews: