8 - EN
6 Testing of the unit
1. Connect a link wire on digital input 4, 5, 6 or 7.
2. Use the available simulation program for checking:
�
the analog input;
�
output;
�
communication ports;
�
digital input and relays.
7 Commissioning
Follow the commissioning instructions given in the
ComfoAir XL manual.