16-02-05 Page 7 of 19 Operation Instructions for Electronic InBuilt EIB 2002
CLEARANCES
The YUNCA ELECTRONIC INBUILT FLUED GAS HEATER should be installed with clearances
equal to or greater than those recommended below and comply with NZS 5261.
CONNECTING THE FAN
The fan should be connected to the mains supply (240V 50Hz) via the 3m flex and 3pin plug provided.
The lead is factory positioned for a left-hand plug position as shown above.
The cord is stored and attached to the cowl for freighting.
When inserting the heater into the cavity, ensure the cord is not damaged.
If power lead is to repositioned on the right hand side, during installation remove the cord grommet
from the LH side panel. Remove the hearth and grill to run the power cord in front of the fan box and
along the cowel base. Eg as low as possible to ensure it is kept cool. The rubber grommet is
repositioned to fit in to the slot in the RH panel to protect the power cord from damage.
Note: Do not position the Power lead on top of the fan.