FORM NO.:
6U5M-A11M-N
B
-
EN
JOHNSON CONTROLS
17
Water system Pipework arrangement
The following are suggested pipework arrangements for single unit with built-in pump installations. For multiple
unit installations, each unit should be piped as shown.
Chilled water system for single unit
FIGURE
9
–
SINGLE UNIT SYSTEM (WITHOUT EXTERNAL PUMP)
FIGURE
10
–
SINGLE UNIT SYSTEM (WITH EXTERNAL PUMP)
Notes
:
Parts in the dotted box are optional components, and if the site does not need installation, the pipeline
here can be directly connected
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz