JOHNSON CONTROLS
38
JOHNSON CONTROLS
1
Supersedes: 160.81-CL1 (411)
INSTALLATION CHECKLIST AND REQUEST FOR AUTHORIZED START-UP ENGINEER
MODEL YR
Form 160.81-CL1 (912)
The following work must be completed in accordance with installation instructions:
CUSTOMER: _________________________________
ADDRESS: __________________________________
PHONE: _____________________________________
JCI TEL NO: ____________________ JCI ORDER NO: ________________ JCI CONTRACT NO: ____________
JOB NAME: _________________________________
LOCATION: _________________________________
CUSTOMER ORDER NO: ______________________
CHILLER MODEL NO
: ____________________________
The work (as checked below) is in process and will be completed by: _____________ / ____________ /
___________
UNIT SERIAL NO
: ___________________________
Month
Day
Year
D. ELECTRICAL WIRING
1. ELECTRO-MECHANICAL STARTER
a. Main and control power supply available ......
b. Compressor motor starter furnished in ac-
cordance with, Johnson Controls Standard
R-1079–Form 160.47-PA5.1 ...........................
c. Wiring completed from main power supply
to starter –
but not cut to length or con-
nected to starter
........................................
d. Wiring completed from starter to compressor
motor –
but not cut to length or connect-
ed to motor
.................................................
e. 115 volt service completed to Control Center
–
but not connected
..................................
2. SOLID STATE STARTER
a. Main and control power supply available ......
b. Wiring completed from main power supply
to solid state starter –
but not cut to
length or connected to starter
..................
3. CONTROL CENTER
a. Jumper wire NOT installed between termi-
nal 24 and 25 located on the control center
terminal strip .................................................
b. External control wiring completed from the
control center to chilled water flow switches
or interlocks in accordance with the Johnson
Controls Wiring Diagram ................................
c. Power available and wiring completed to the
following starters and motors, and rotation
of each checked ...........................................
1. Chilled water pump(s) ..............................
2. Condenser water pump(s) .......................
3. Cooling tower fan .....................................
d. Meg ohm meter available for checking motor
windings ............................................................
A. YORK CHILLER
1. Unit assembled (if shipped dismantled) and
refrigerant piping installed under Johnson
Controls supervision .........................................
2. Vibration isolator mounts so the unit is level,
and isolators equally deflected ..........................
B. WATER PIPING
1. Condenser water piping installed between
condenser, pumps and cooling tower ...............
2. Chilled water piping installed between
evaporator, pumps, and cooling coils ................
3. Make-up and fill lines installed to cooling
tower and chilled water system .........................
4. All water piping checked for strain – Piping
should not spring when connections are
broken at unit ....................................................
5. Water piping leak tested and flushed, and
water strainers cleaned after flushing.
Piping systems filled with water and trapped
air vented ..........................................................
6. Chilled and condenser water flow available
to meet unit design requirements ......................
C. REFRIGERANT RELIEF PIPING
(when required)
Refrigerant relief piping (with flexible connection)
installed from unit to atmosphere
(per ASHRAE-15) ....................................................