Form 7 Shipment
1. Locate evaporator and condenser shells in their
final position.
2.
Remove shipping closures from the flanges on
refrigerant line on bottom of evaporator and con-
denser. (Shells are shipped with a holding charge
of nitrogen.) Discard gaskets. Install orifice plate
using new gaskets and 3/4" x 3" long cap screws
and nuts.
3. Bolt tube sheets together using cap screws, lock
)
4. Assemble vibration isolators to the unit. (Refer
to
Locating and Installing Isolator Pads on page
5. Level shells in both directions. The longitudi-
nal alignment of the shell should be checked by
placing a level on the top of the shell, next to the
discharge connection. The transverse alignment
should be checked by placing a level on the tops
of both end sheets. After shell is leveled, wedge
and shim each corner of the shell to solidly sup-
port it while assembling the other parts.
6. Lift compressor-motor assembly and remove
packing materials and shipping skids. Keep the
compressor unit supported by the hoist until all
connections are finally made to the shell assem
-
bly. (Refer to
method.) Remove closure covers and be sure
flanges are clean.
Evaporator-Condenser Shells –
Remove all refriger-
ant connection covers.
Shells are shipped with a 5 psig (34 kPa)
nitrogen charge.
7.
Place gasket on the evaporator suction flange and
lower the compressor assembly. Guide the studs
through the gasket and suction flange on top of
evaporator. (Refer to
8. Insert the cap screws, washers, and nuts to fasten
the motor to the motor support bracket. Level the
compressor-motor. If necessary, adjust the screws
and nuts to level compressor, and add shims if
necessary, between the motor feet and the sup-
FIGURE 10 -
FORM 7 SHIPMENT
LD09035