
00562VIP
R-134a
MODELS
YR TB TB T0 THROUGH YR VD VD T1
YR TB TB T0 THROUGH YR XD XD T3
INCLUDING
FIELD RE-ASSEMBLY FOR FORM 2, 3, 7 AND 8 SHIPMENT
(STYLE A AND B)
ROTARY SCREW LIQUID CHILLERS
INSTALLATION, OPERATION, MAINTENANCE
Supersedes: 160.81-NOM1 (212)
Form 160.81-NOM1 (1020)
Issue Date:
October 3, 2020