JOHNSON CONTROLS
3
FORM 160.69-O2
ISSUE DATE: 9/30/2020
MANUAL DESCRIPTION
FORM NUMBER
YD Style A Unit Installation Manual
160.69-N1
YD Style B Unit Installation Manual
160.69-N2
YD Style C Unit Installation Manual
160.69-N3
Field Connections
160.69-PW6
Unit Wiring and Field Control Modifications
160.69-PW2
Unit Replacement Parts
160.69-RP2
OptiView
TM
Replacement Parts
160.69-RP1
YD OptiView Operations Manual
160.69-O1
All Products - Replacement Parts Electrical Connectors
50.20-RP1
All Products - Replacement Parts Fittings
50.20-RP2
Centrifugal Chiller Long Term Storage
50.20-NM5
CHANGEABILITY OF THIS DOCUMENT
In complying with Johnson Controls’ policy for contin-
uous product improvement, the information contained
in this document is subject to change without notice.
Johnson Controls makes no commitment to update
or provide current information automatically to the
manual or product owner. Updated manuals, if appli-
cable, can be obtained by contacting the nearest John-
son Controls Service office or accessing the Johnson
Controls Knowledge Exchange website at https://docs-
johnsoncontrols-uat.fluidtopics.net/chillers/home.
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
regarding the applicability of these documents, rig-
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
ASSOCIATED LITERATURE
AFFECTED PAGES
DESCRIPTION
3
Conditioned Based Maintenance information added
REVISION NOTES
Revisions made to this document are indicated in the following table. These revisions are to technical information,
and any other changes in spelling, grammar, or formatting are not included.
CONDITIONED BASED MAINTENANCE
Traditional chiller maintenance is based upon assumed
and generalized conditions. In lieu of the traditional
maintenance program, a Johnson Controls YORK
Conditioned Based Maintenance (CBM) program can
be substituted. This CBM service plan is built around
the specific needs for the chiller, operating conditions,
and annualized impact realized by the chiller. Your lo-
cal Johnson Controls Branch can propose a customized
Planned Service Agreement that leverages real time
and historical data, delivering performance reporting,
corrective actions required and data enabled guidance
for optimal operation and lifecycle assurance. The pro-
gram will include fault detection diagnostics, operation
code statistics, performance based algorithms and ad-
vance rules based rationale delivered by the Johnson
Controls Connected Equipment Portal.
Summary of Contents for YD A
Page 8: ...JOHNSON CONTROLS 8 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 22: ...JOHNSON CONTROLS 22 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 28: ...JOHNSON CONTROLS 28 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 34: ...JOHNSON CONTROLS 34 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...JOHNSON CONTROLS 48 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...