SECTION 1 – DESCRIPTION OF SYSTEM AND FUNDAMENTALS OF OPERATION
FIGURE 2
– CHILLER OPERATION FLOW CHART - (CONT'D)
LD10492
2 Compressors Running
(from Page 3)
Electro-Mechanical Starter
Chiller Fault Stop
(manual or auto restart)
Stop both compressors
simultaneously
Chiller Fault
Condition
Post Lube Run time
both compr oil pumps
Energize Oil Heater
1 Compressor Running
(from Page 1 or 4)
Chiller Fault
Condition
Post Lube Run time
lead compr oil pump
Energize Oil Heater
System Standby
Close compressor vanes
and close discharge
valves
Stop Lead (both)
compressor
Close compressor vanes
and close discharge
valves
YD Dual Compressor Chiller
Summary of Contents for YD A
Page 8: ...JOHNSON CONTROLS 8 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 22: ...JOHNSON CONTROLS 22 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 28: ...JOHNSON CONTROLS 28 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 34: ...JOHNSON CONTROLS 34 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...JOHNSON CONTROLS 48 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...