![York YCUZ330A3 Installation Operation & Maintenance Download Page 8](http://html1.mh-extra.com/html/york/ycuz330a3/ycuz330a3_installation-operation-and-maintenance_4224509008.webp)
8
YORK INTERNATIONAL
1. Clearances – Recommended YORK required clearances to pre-
vent condenser air recirculation and faulty operation of units are as
follows:
Side to wall - 5'-0"
Rear to wall - 8'-0"
Front to wall - 8'-0"
Top - 50'-0"
Distance between adjacent units - 12'-0"
*No more than one wall can be higher than the top of the unit.
Failure to heed recommended clearances may result in reduced
system performance, nuisance shutdowns, and servicing problems.
The area within the clearances shown above and the area under the
unit must be kept clear of all obstructions that would impede free
air flow to the unit. In installations where winter operation is in-
tended and snow accumulations are expected, additional unit height
must be provided to insure full air flow.
2. Bottom of panel to be punched in field to allow for power wiring
entry. See page 9.
3. Use of isolators (optional) will increase height of unit approximately 6".
DIMENSIONS
MODEL
DIMENSIONS (in.)
YCU
A
B
G
H
Z330A3
43-15/32
15-1/16
2-1/8 ODS 2-1/8 ODS
Z440A3
Z740B3
43-15/32
15-1/16
2-1/8 ODS 2-5/8 ODS
Z770B3
Z880B3
44-3/32
13-13/16
3-1/8 ODS 3-1/8 ODS
WEIGHT DISTRIBUTION (lbs.)
MODEL
ALUMINUM
COPPER
YCU
C
D
E
F
C
D
E
F
Z330A3
622
622
1309 1309
880
880
1366 1366
Z440A3
683
683
1406 1406
915
915
1489 1489
Z740B3
733
733
1461 1461 1055 1055 1558 1558
Z770B3
755
755
1588 1588 1077 1077 1685 1658
Z880B3
746
746
1530 1530 1068 1068 1628 1628
LD00566