background image

FIG. 3 - TYPICAL FIELD WIRING

3. Use wrought iron or steel pipe for all gas lines. Pipe

compound should be applied sparingly to male threads only.

WARNING: Natural gas may contain some propane. Propane,

being an excellent solvent, will quickly dissolve
white lead or most standard commercial com-
pounds. Therefore, a special pipe dope must be
applied when wrought iron or steel pipe is used.
Shellac base compounds such as Gaskolac or
Stalastic, and compounds such as Rectorseal #5,
Cyde’s or John Crane may be used.

4. All piping should be cleaned of dirt and scale by hammering

on the outside of the pipe and blowing out the loose dirt and
scale. Before initial start-up, be sure that all of the gas lines
external to the unit have been purged of air.

5. The gas supply should be a separate line and installed in

accordance with all safety codes as prescribed under “Limi-
tations”. After the gas connections have been completed,
open the main shut-off valve admitting 

normal gas pressure

to the mains. Check all joints for leaks with soap solution or
other material suitable for the purpose. NEVER USE A
FLAME.

6. The furnace must be isolated from the gas supply piping

system by closing its individual manual shut-off valve during
any pressure testing of the gas supply piping system at test
pressures in excess of 1/2 psig (3.48kPa).

The furnace must be isolated from the gas supply piping
system by closing its individual manual shut-off valve during
any pressure testing of the gas supply piping system at test
pressures equal to or less than 1/2 psig (3.48kPa).

7. A 1/8 inch NPT plugged tapping, accessible for test gage

connection, must be installed immediately upstream of the
gas supply connection to the furnace.

COMBUSTION DISCHARGE

The products of combustion are discharged horizontally through
a screened (hooded) opening on the upper gas heat access
panel.

GAS PIPING

Proper sizing of gas piping depends on the cubic feet per hour
of gas flow required, specific gravity of the gas and the length
of run. “National Fuel Gas Code” Z223.1 (in U.S.A.) or the
current Gas Installation Codes CAN/CGA-B149.1 and .2 (in
Canada) should be followed in all cases unless superseded by
local codes or gas company requirements.
The heating value of the gas may differ with locality. The value
should be checked with the local gas utility.

NOTE: There may be a local gas utility requirement specifying

a minimum diameter for gas piping. All units require a
1/2 or 3/4 inch pipe connection at the gas valve.

GAS CONNECTION

The gas supply line can be routed through the knockouts located
on the front of the unit or through the opening provided in the unit’s
base. Refer Dimensions and Clearances Figure to locate these
access openings. Typical supply piping arrangements are shown
in External and Bottom Supply Connection Figures 5 & 6. All pipe
nipples, fittings and the gas cock are field-supplied. A  gas piping
kit (1GP0402) is available for bottom supply with external shutoff.
Two grommets are shipped in the blower compartment (in parts
bag taped to the blower housing) of every unit with gas heat and
should be used in the knockouts when the gas piping penetrates
the front of the unit.
After the gas supply piping has been installed, the bottom
opening should be sealed to prevent water from leaking into the
building.
Gas piping recommendations:

1. A drip leg and a ground joint union must be installed in the

gas piping.

2. When required by local codes, a manual shut-off valve may

have to be installed outside of the unit.

Input

Capacity,

(Mbh)

Output

Capacity,

(Mbh)

Available on

Models

Gas Rate

1

(Ft.

3

/Hr.)

Temp. Rise 

°

F

At Full Input 

2

Min.

Max.

163

130

7

1

2

 & 8

1

2

Ton

152

30

60

204

163

7

1

2

 - 12

1

2

 Ton

190

30

60

245

198

10 & 12

1

2

 Ton

228

30

60

NOTE: Gas Heaters are shipped available for natural gas, but can be converted to L.P. with
            Kit Model No. 1NP0437.

1

Based on 1075 Btu/Ft

3

.

2

The air flow must be adjusted to obtain a temperature rise within the range shown.

TABLE 2 - GAS HEAT APPLICATION DATA

Length in Feet

Nominal Iron Pipe Size

1/2 in.

3/4 in.

1 in.

1-1/4 in.

10
20
30
40
50
60
70
80
90

100

132

92
73
63
56
50
46
43
40
38

278
190
152
130

115

105

96
90
84
79

520
350
285
245
215
195
180
170
160
150

1,050

730
590
500
440
400
370
350
320
305

Maximum capacity of pipe in cubic feet of gas per hour. (Based upon a pressure drop of 0.3
inch water column and 0.6 specific gravity gas).

TABLE 3 - PIPE SIZING

*24 Volt Thermostat 2TH04701024 or
(2TH04701524 w/Subbase 2TB04700224)

530.18-N10Y

Unitary Products Group

5

Summary of Contents for Sunline 2000 D3CG090

Page 1: ...ccessory 530 18 N10 5V Propane Conversion Accessory USA 530 18 N10 6V High Altitude Accessory Nat Gas 530 18 N10 7V High Altitude Accessory Propane 690 15 N28V Low Ambient Accessory Renewal Parts Refer to the Renewal Parts Manual for complete listing of replacement parts on this equipment All forms referenced in this instruction may be ordered from Publications Distribution Center Unitary Products...

Page 2: ... Gas Heat Application Data 5 3 Pipe Sizing 5 4 Physical Data 8 5 Point Loads 10 6 Supply Air Blower Perf 7 1 2 10 Ton 11 7 Supply Air Blower Perf 12 1 2 Ton 12 8 Accessory Static Resistances 12 9 Blower Motor and Drive Data 12 10 Electrical Data 13 11 Limit Control Setting 14 12 Blower Motor Pulley Adjustment 16 13 Gas Rate Cubic Feet Per Hour 17 FIGURES No Description Page 1 Center of Gravity 3 2...

Page 3: ...ing must be applied to all surfaces that come in contact with the unit underside 5 Maintain level tolerance to 1 2 maximum across the entire length or width of the unit RIGGING AND HANDLING Exercise care when moving the unit Do not remove any packaging until the unit is near the place of installation Rig the unit by attaching chain or cable slings to the lifting holes provided in the base rails Sp...

Page 4: ... above the floor where it will not be subject to drafts sun exposure or heat from electrical fixtures or appliances Follow manufacturer s instructions enclosed with thermostat for general installation procedure Seven color coded insulated wires 18 AWG should be used to connect thermostat to unit POWER AND CONTROL WIRING Field wiring to the unit must conform to provisions of the National Electrical...

Page 5: ...cases unless superseded by local codes or gas company requirements The heating value of the gas may differ with locality The value should be checked with the local gas utility NOTE There may be a local gas utility requirement specifying a minimum diameter for gas piping All units require a 1 2 or 3 4 inch pipe connection at the gas valve GAS CONNECTION The gas supply line can be routed through the...

Page 6: ...n three main factors 1 The vaporization rate which depends on a the temperature of the liquid and b the wetted surface area of the container or containers 2 The proper pressure regulation Two stage regulation is recommended from the standpoint of both cost and effi ciency 3 The pressure drop in the lines between regulators and between the second stage regulator and the appliance Pipe size required...

Page 7: ...sing 6 gasketed screws in each side plate 4 Secure the flange on the hood cover to the duct panel with 3 screws Use holes in the cover flange as a template and drill 3 holes 9 64 dia 26 drill into the duct panel 5 Insert two 2 1 filters into the center of the hood coming to rest in the center filter support at the back of the hood Press filters up against the filter guide angles on the side plates...

Page 8: ...er Unit PROPELLER DIA in 24 ea 24 ea 24 ea 24 ea FAN MOTOR HP 1 2 ea 1 2 ea 1 2 ea 3 4 ea NOM CFM TOTAL 2900 ea 3200 ea 3600 ea 4400 ea CONDENSER COIL ROWS DEEP 2 2 2 2 FINS PER INCH 13 13 13 13 FACE AREA Sq Ft 16 7 20 0 24 0 29 3 AIR FILTERS SEE NOTE QUANTITY PER UNIT 12 X 24 X 2 2 2 QUANTITY PER UNIT 16 X 24 X 2 2 2 2 3 QUANTITY PER UNIT 18 X 24 X 2 2 2 TOTAL FACE AREA sq ft 9 3 9 3 11 3 14 0 CH...

Page 9: ... in the insulation UTILITIES ENTRY DATA RETURN AIR OUTDOOR AIR Economizer SUPPLY AIR CONDENSER AIR DUCT COVERS Units are shipped with all air duct openings covered For side duct applications 1 Remove and discard the supply and return air duct covers 2 Connect ductwork to duct flanges on the rear of the unit For bottom duct applications 1 Remove the side supply and return air duct covers to gain ac...

Page 10: ...ht Side Cond Coil 24 Below Unit1 20 Above Unit2 72 with 36 maximum Horizontal Overhang For Condenser Air Discharge 1 Locate unit so that the vent air outlet hood is at least Three 3 feet above any forced air inlet located within 10 horizontal feet excluding those integral to the unit Four 4 feet below 4 horizontal feet from or 1 foot above any door or gravity air inlet into the building Four 4 fee...

Page 11: ...39 1 54 1 44 0 04 1 75 1 63 1070 0 86 1 46 1 36 0 54 1 68 1 57 0 20 1 89 1 76 0 04 2 11 1 97 1130 1 07 1 57 1 46 0 73 1 83 1 71 0 39 2 04 1 90 0 13 2 22 2 06 1175 1 27 1 67 1 56 0 94 1 92 1 79 0 58 2 18 2 03 0 28 2 34 2 16 1220 1 44 1 81 1 69 1 10 2 10 1 96 0 66 2 37 2 15 0 36 2 78 2 56 MODEL DCG102 BOTTOM DUCT APPLICATIONS BLOWER SPEED RPM CFM 3000 3500 4000 4500 5000 ESP BHP KW ESP BHP KW ESP BH...

Page 12: ... 54 0 11 3 03 2 83 1000 1 20 2 33 2 17 0 93 2 62 2 45 0 65 2 91 2 72 0 35 3 24 3 03 0 16 4 20 3 91 1050 1 42 2 55 2 37 1 14 2 86 2 67 0 85 3 17 2 96 0 62 4 06 3 79 0 39 4 53 4 22 1090 1 63 2 72 2 54 1 34 3 06 2 86 1 10 3 78 3 53 0 78 4 28 3 99 0 58 4 79 4 46 1105 1 74 3 08 2 87 1 47 3 45 3 22 1 18 3 88 3 62 0 85 4 35 4 06 0 66 4 89 4 56 1140 1 91 3 25 3 03 1 63 3 66 3 41 1 35 4 11 3 83 1 02 4 53 4...

Page 13: ...frigerant charge Opens at 7 psig 3 and resets at 22 psig 5 If either one of the above safety controls opens that individual refrigerant system will bo locked out The other refrigerant system will continue in operation unless it too is effected by the same fault The lock out of either system can be reset by opening the 24V circuit either at the room thermostat or at the unit disconnect HEATING SEQU...

Page 14: ...tes when a high temperature condition caused by inadequate supply air flow occurs thus shutting down the ignition control and closing the main gas valve and energizing the blower 2 Centrifugal Switch CS If the draft motor should fail the centrifugal switch attached to the shaft of the motor pre vents the ignition control and gas valve from being ener gized 3 Redundant Gas Valve This valve is an in...

Page 15: ...ows 1 Remove the cap on the regulator It s located next to the push on electrical terminals 2 To decrease the gas pressure turn the adjusting screw coun terclockwise 3 To increase the gas pressure turn the adjusting screw clock wise NOTE The correct manifold pressure for these furnaces is 3 5 IWG 0 3 PILOT CHECKOUT The pilot flame should envelope the end of the flame sensor as shown in Proper Flam...

Page 16: ...ted 1 Remove the dot plugs from the holes in the filter access and blower access panels as shown in the Dimensions and Clearances figure 2 Insert at least 8 of 1 4 inch tubing into each of these holes for sufficient penetration into the air flow on both sides of the evaporator or indoor coil NOTE The tubes must be inserted and held in a position perpendicular to the air flow so that velocity pres ...

Page 17: ...being made for the permissible range of the regulator setting replace the orifice spuds with spuds of the proper size CFM Btuh Input x 0 8 1 08 x o F Temp Rise SECURE OWNER S APPROVAL When the system is functioning properly secure the owner s approval Show him the location of all disconnect switches and the thermostat Teach him how to start and stop the unit and how to adjust temperature settings ...

Page 18: ...pplied along top of the burner COMBUSTION AIR DISCHARGE Visually inspect discharge outlet periodically to make sure that the buildup of soot and dirt is not excessive If necessary clean to maintain adequate combustion air discharge CLEANING FLUE PASSAGES AND HEATING ELEMENTS With proper combustion adjustment the heating element of a gas fired furnace will seldom need cleaning If the element should...

Page 19: ...t effect the test if it is done within 5 minutes of furnace shut down 2 The supply air blower operates but the draft motor does not when the room thermostat is set to call for heat and the fan switch in the ON position a The draft motor has inherent protection If the motor shell is hot to the touch wait for the internal overload to reset b If the motor shell is cold with the room thermostat callin...

Page 20: ...arryover as described in PILOT CHECKOUT b Make sure that the carryovers on adjoining burners are screwed fast and are level with respect to one another 9 Main burners light but exhibit erratic flame characteristics a Adjust air shutters as described in BURNER AIR SHUTTER ADJUSTMENT b Check the main burner orifices for obstruction and alignment Removal procedure is described in BURNER INSTRUCTIONS ...

Reviews: