A List of the default values entered into memory, if this
program option is selected, is shown below:
6140
PROGRAMMABLE VALUE
DEFAULT
SETTING
Discharge Pressure Cutout
R22
399 PSIG
R134a
275 PSIG
Low Ambient Cutout
Std. Amb.
25°F
Low Amb.
0°F
High Ambient Temp. Cutout
100°F
Discharge Pressure Unload
R22
375 PSiG
R134a
255 PSIG
Average Current Unload
105%
Anti-Recycle Timer
600 sec.
Leaving Chilled Liquid Cutout
36°F
Suction Pressure Cutout
R22
44 PSIG
R134a
19 PSIG
Lag Panel Start Pt (YDAS Only)
50%
Lag Panel Diff. Off (YDAS Only)
20%
Lag Compressor Start Point
70%
Lag Compressor Differential Off
50%
Fan Control Dischg. Press. Setpt.
R22
230 PSIG
R134a
102 PSIG
Fan On / Off Differential
R22
50 PSIG
R134a
50 PSIG
System Motor Current
Liquid Injection Temp. Limit
108°F
System Full Load Cond. Temp.
Communications Mode
2
Load Share Based On ?
2
Economizer Valve On Point
50%
Economizer Valve Off Point
40%
Summary of Contents for Millennium YCAS 310
Page 11: ...FORM 201 10 NM3 11 YORK INTERNATIONAL YCAS 310 380 DIMENSIONS English Units LD01594 LD01593...
Page 13: ...FORM 201 10 NM3 13 YORK INTERNATIONAL YCAS 310 380 DIMENSIONS SI Units LD01598 LD01597...
Page 21: ...FORM 201 10 NM3 21 YORK INTERNATIONAL 28514A FILTER DRYER LIQUID STOP VALVE...
Page 36: ...YORK INTERNATIONAL 36 YCAS 310 380 SYSTEMS 1 AND 2 CONNECTION DIAGRAM WYE DELTA START LD02032...
Page 37: ...FORM 201 10 NM3 37 YORK INTERNATIONAL LD02033...
Page 42: ...YORK INTERNATIONAL 42 YCAS 310 380 SYSTEM 3 CONNECTION DIAGRAM WYE DELTA START LD02038...
Page 43: ...FORM 201 10 NM3 43 YORK INTERNATIONAL LD02039...
Page 48: ...YORK INTERNATIONAL 48 LD02021...
Page 54: ...YORK INTERNATIONAL 54 LD02027...