
Mechanical Installation
Part 2
Step 18
Parts Required:
➔
Control Board (with Wiring
and Drag Chain)
➔
2 M5x20 Screws
Place the Control Board in the right
front corner of the machine frame.
Route the wiring behind the right
front foot, ensuring that the wiring
is not “pinched” in between the
Control Board and the foot.
Attach the Control Board to the
Front Frame Rail with 2 M5x20
Screws