![Yolink YS4909-UC Manual Download Page 14](http://html2.mh-extra.com/html/yolink/ys4909-uc/ys4909-uc_manual_3451041014.webp)
3. Begin Installa on
Insert the screw through the top of the
brackets and the moun ng ear of the
manipulator with the non-threaded hole
(place the two
handle
-
suppor ng
bolts on
either side of the handle)
2
1. The manipulator should be installed
close to the ball valve
2. Ensure the clutch and rocker arm can
be moved freely
1. Keep the center axis of the output sha of
manipulator aligned with the center axis of
the sha of ball valve
2. Keep at least 0.2 inch (5 millimeter) gap
between the output sha of manipulator and
the sha of ball valve
I n s e r t t h e s c re w t h ro u g h t h e
b o o m o f b r a c ke t s w i t h t h e
non-threaded hole
(
the threaded
hole should be facing inside
, do
not ghten the screw)
1
11
Output Sha of
Manipulator
Sha of
Ball Valve
Gap: At Least
0.2 inch
(5 millimeter)