2.2 Position of Process Flanges for Launch and Detect Units:
Process flanges should be located on the process such that the Launch and Detect Units can be
installed, accessed removed in a safe and convenient manner.
The following criteria/Check List should be met at a minimum:
•
Good, Safe Engineering practices
•
Local codes and regulations for such equipment installation
•
Appropriate hazardous area (if applicable) precautions
•
Owner Company best practice and engineering standards
•
Access for personnel to stand in front of launch and Detect Units
•
Clearance for installation and removal of Launch and Detect (see below)
•
Clearance for installation and removal of purge insertion tubes (if applicable)
•
Access to process isolation valves
•
Safe routing for interconnecting cables
•
Ambient conditions in accordance with analyzer limits
•
Access to appropriate utilities
•
Adjacent space for mounting to Calibration Cell when off-line
Summary of Contents for TDLS200
Page 14: ...14 IM11Y01B01 12E A 2nd Edition...
Page 15: ...15 IM11Y01B01 12E A 2nd Edition...
Page 21: ...21 IM11Y01B01 12E A 2nd Edition...
Page 25: ...25 IM11Y01B01 12E A 2nd Edition...
Page 26: ...26 IM11Y01B01 12E A 2nd Edition...
Page 27: ...27 IM11Y01B01 12E A 2nd Edition...
Page 29: ...29 IM11Y01B01 12E A 2nd Edition...
Page 30: ...30 IM11Y01B01 12E A 2nd Edition...
Page 31: ...31 IM11Y01B01 12E A 2nd Edition...
Page 33: ...33 IM11Y01B01 12E A 2nd Edition...
Page 34: ...34 IM11Y01B01 12E A 2nd Edition...