40
IM 77C01E31-01EN
SFLC-212-181
40
(3) 131H
to
135
Demand detection setting
The next operation method is setting. Demand current, Demand power, High-alarm value, Time-interval, Power-factor,
Demand power operation method.
131H
Demand current
upper limit
132
Demand current
time interval
135
Demand power
operation method
1
34
Demand power
time interval
133H
Demand power
upper limit
RESET/
SHIFT
MAX/MIN
RESET/
SHIFT
MAX/MIN
RESET/
SHIFT
MAX/MIN
RESET/
SHIFT
MAX/MIN
RESET/SHIFT
MAX/MIN
◆
131H
Demand current upper limit
. 133H
Demand power upper limit.
Sets the high-alarm value of demand current (DA) and demand power (DW).
The setting range is 5 to 100% (1% step) and OFF. (To full scale = 100%)
Selection by
+
and
-
, set value is updated by SET .
Default setting: 80% (demand current), OFF (demand power)
◆
132
Demand current time interval
. 134
Demand power time interval.
Sets the time interval (95% time interval) of demand current(DA)
and demand power(DW).
Selection by
+
and
-
, set value is updated by SET .
Default setting: 0 second (Demand current, Demand power)
0sec
(Nothing)
+
-
5sec
+
-
10sec
20sec
30sec
+
-
40sec
50sec
1min
-
+
+
-
2min
-
+
3min
4min
5min
-
+
6min
-
+
7min
8min
9min
10min
15min
20min
+
-
25min
30min
+
-
-
+
+
-
-
+
+
-
-
+
+
-
-
+
+
-
-
+
+
-
-
+
◆
135
Demand operation method
The operating system of demand (DW) can be selected
from d (operating system according with bimetallic
type: demand) and A (averaging arithmetic in demand
time delay: average).
Selection by
+
and
-
, set value is updated by SET .
Default setting: d (operation method according with bimetallic type)
● Demand time delay characteristic (Demand current, Demand power)
0
20
40
60
80
100
0
10
20
30
Time (min)
Demand
value
(%)
Time interval 10 minutes
95
Arithmetic method
Demand current measurement: Arithmetic method according with bimetallic type.
Demand power measurement : Arithmetic method according with bimetallic type (Default value).
Or the averaging arithmetic in a demand time interval.
One is selected by setting.
100%
indication time is about 3 times the time
delay at the case of the arithmetic method according with bimetallic
type. (In case of
10 minutes/
95% of time-interval, time to reach to 100%
is about 30 minutes.
)
Demand measurement is measured to the
2 times
of the rated current, and the
2 time
of a rated active power.
Demand current time interval
New setting
Setting factor
Now setting
Setting No.
d: Operating system
according with
bimetallic type
A: Averaging
arithmetic in
demand time
delay
+
-
+
-
Arithmetic method
according with bimetallic
type.
(Indication time to 95% of a
final constant value)
Averaging arithmetic in
demand time delay.
(Averaging time in demand
time delay.)