ii
CONTENTS
IM 01C25C01-01E
External Indicator Connection ...................................................... 6-1
Communicator Connection ........................................................... 6-1
Check Meter Connection .............................................................. 6-2
Status Output Connection ............................................................ 6-2
Loop Configuration ....................................................................... 6-2
General-use Type and Flameproof Type ..................................... 6-2
Intrinsically Safe Type ................................................................. 6-2
Wiring Installation ......................................................................... 6-2
General-use Type and Intrinsically Safe Type ............................. 6-2
Flameproof Type ......................................................................... 6-3
Power Supply Voltage and Load Resistance ..................................... 6-3
Preparation for Starting Operation ...................................................... 7-1
Zero Point Adjustment ........................................................................ 7-2
Shutting Down Operation .................................................................... 7-3
Venting or Draining Transmitter Pressure-detector Section ............... 7-3
Draining Condensate .................................................................... 7-3
Venting Gas .................................................................................. 7-3
Draining Condensate for Flushing Connection Ring ................... 7-4
Venting Gas for Flushing Connection Ring ................................. 7-4
Setting the Range Using the Range-setting Switch ........................... 7-4
Calibration Instruments Selection ....................................................... 8-1
Disassembly and Reassembly ............................................................ 8-3
Replacing the Integral Indicator ................................................... 8-3
Replacing the CPU Board Assembly ........................................... 8-4
Replacing the Process Connector Gasket ................................... 8-4
Basic Troubleshooting .................................................................. 8-5
Troubleshooting Flowcharts ......................................................... 8-5
Alarms and Countermeasures ..................................................... 8-7
GENERAL SPECIFICATIONS ...................................................................... 9-1
Standard Specifications ...................................................................... 9-1
MODEL AND SUFFIX CODES ........................................................... 9-4
OPTIONAL SPECIFICATIONS (For Explosion Protected type) ....... 9-10
DIMENSIONS .................................................................................... 9-12
When using the EJX in a Safety Instrumented Systems(SIS) application,
refer to Appendix A in either IM 01C25T01-01E for the HART protocol or
IM 01C25T03-01E for the BRAIN protocol.