12-4
IM AQ1200-01EN
Loading a Project File
Load the same project file onto the master and the slave.
1.
Using the
rotary knob
and
ENTER
, select
Multi-Core Loss Test
.
2.
Press the
File
soft key to display the following screen.
Set the drive to load from (internal
memory, USB memory)
Loads the file
The project information is loaded from the
selected file, and the loss test screen
appears.
Using the
rotary knob
and
ENTER
,
select a project information file.
Restarting an Interrupted Loss Test
When the loss test for a shared project is interrupted, you can restart it where it left off, retaining the
results of the test so far.
The operation for restarting the test is the same for both the master and the slave.
1.
Using the
rotary knob
and
ENTER
, select
Multi-Core Loss Test
.
2.
Press the
Previous Project
soft key to display the following screen.
Loads the previous project
The lost test screen appears with the
previous lost test data retained.
Display Example: Master
12.2 Sharing Projects