14
Assembly Instructions
Row Unit Down Force
– Use 3/8” black airline & 3/8” tees to plumb this circuit.
On rigid toolbars, start at row 1, route the airline to the last row & install into the elbow fitting on the down force air bag. Trace this airline back to
row 1 installing 3/8
” tees at each row. At row 1, cut the airline to length & install into the fitting on the down force air bag. At the tee installed at
each row, install airline from the tee to the fitting on the down pressure air bag. Install a 3/8
” X 3/8” X ¼” tee reducer in this trunk line near the
center of the toolbar & install the
¼” airline labeled DF on the tubing harness from the cab controller to the ¼” port of the tee reducer.
On folding toolbars, start at row 1, route airline to the last row on the left wing & install into the fitting on the down force air bag. Trace this airline
back to row 1 installing a tee at each row. At row 1, cut the airline to length & install into the fitting on the down force air bag. At the tee installed
at each row, install airline from the tee to the fitting on the down force air bag. Repeat this process for the center frame & right wing rows. Install
airline & tees to connect the left wing & right wing to the center frame trunk line. Install a 3/8
” X 3/8” X ¼” tee reducer in the center frame trunk
line near the center of the toolbar & install the ¼” airline labeled DF on the tubing harness from the cab controller.
Rolling Basket Down
– Use 3/8” black airline & 3/8” tees to plumb this circuit.
On rigid toolbars, start at row 1 & route the airline to the last row & install into the fitting on the down pressure side of the rolling basket air
cylinder. Trace this airline back to row 1 installing 3/8
” tees at each row. At row 1, cut the airline to length & install into the fitting on the down
pressure side of the rolling basket air cylinder. At the tee installed at each row, install airline from the tee to the fitting on the down pressure side
of the rolling basket air cylinder. Install a 3/8
” X 3/8” X ¼” tee reducer in this trunk line near the center of the toolbar & install the ¼” airline labeled
RB DN on the tubing harness from the cab controller.
On folding toolbars, start at row 1 & route airline to the last row on the left wing & install into the fitting on the down pressure side of the rolling
basket air cylinder. Trace this airline back to row 1 installing a tee at each row. At row 1, cut the airline to length & install into the fitting on the
down pressure side of the rolling basket air cylinder. At the tee installed at each row, install airline from the tee to the fitting on the down pressure
side of the rolling basket air cylinder. Repeat this process for the center frame & the right wing rows. Install airline & tees to connect the left wing
to the center frame trunk line & the right wing to the center frame trunk line. Install a
3/8” X 3/8” X ¼” tee reducer in the center frame trunk line
near the cent
er of the toolbar & install the ¼” airline labeled RB DN on the tubing harness from the cab controller.
Rolling Basket Up
– Use 3/8” blue airline & 3/8” tees to plumb this circuit.
On rigid toolbars, start at row 1 & route the airline to the last row & install into the fitting on the up pressure side of the rolling basket air cylinder.
Trace this airline back to row 1 installing 3/8
” tees at each row. At row 1, cut the airline to length & install into the fitting on up pressure side of
rolling basket air cylinder. At the tee installed at each row, install airline from the tee to the fitting on the up pressure side of the rolling basket air
cylinder. Install a 3/8
” X 3/8” X ¼” tee reducer in this trunk line near the center of the toolbar & install the ¼” airline labeled RB UP on the tubing
harness from the cab controller.
On folding toolbars, start at row 1 & route airline to the last row on the left wing & install into the fitting on up pressure side of rolling basket air
cylinder. Trace this airline back to row 1 installing a tee at each row. At row 1, cut the airline to length & install into the fitting on the up pressure
side of the rolling basket air cylinder. At the tee installed at each row, install airline from the tee to the fitting on the down pressure side of the
rolling basket air cylinder. Repeat this process for the center frame & the right wing rows. Install airline & tees to connect the left & right wing to
the center frame trunk line
. Install a 3/8” X 3/8” X ¼” tee reducer in the center frame trunk line near the center of the toolbar & install the ¼” airline
labeled RB UP on the tubing harness from the cab controller.
Summary of Contents for CAB CONTROL STRIP FRESHENER 2984-050-R
Page 18: ...18 OPERATION Cab Control Operation...
Page 21: ...21 2984 050 STRIP FRESHENER CC PART IDENTIFICATION...
Page 22: ...22 2984 050 STRIP FRESHENER CC PART IDENTIFICATION...
Page 23: ...23 2984 132 PARALLEL LINKAGE ASSEMBLY PART IDENTIFICATION...
Page 24: ...24 NARROW ROW CLEANER ASSEMBLY PART IDENTIFICATION...
Page 25: ...25 WIDE ROW CLEANER ASSEMBLY PART IDENTIFICATION...
Page 26: ...26 GAUGE WHEEL ASSEMBLY PARTS IDENTIFICATION SHARKTOOTH MOUNT ASSEMBLY PART IDENTIFICATION...
Page 27: ...27 ROLLING BASKET ASSEMBLY PART IDENTIFICATION...
Page 30: ...30 HUB ASSEMBLY PART IDENTIFICATION SCREW ADJUST ASSEMBLY PART IDENTIFICATION...
Page 31: ...31 PARTS IDENTIFICATION...
Page 32: ...32 PARTS IDENTIFICATION...
Page 34: ...34 NOTES...
Page 35: ...35...
Page 36: ...36 2565 968 11 2019...