background image

 
 

 

ASSEMBLY INSTRUCTIONS 

 

GENERAL INFORMATION 

 
 

Examine all equipment carefully for damage or shortages. 
 
Lubricate all bearings and moving parts as assembled. 

 
Reference to front, rear, left and right in this installation instruction are made when sitting in the operator’s 
seat facing direction of forward travel. 

 

BOLT TORQUE 

 
READ THESE INSTRUCTIONS FIRST: 

1.  Improperly tightened bolts will result in damage, breakage, expense, and down time. 
2.  Always replace bolts with the specified grade and type. 
3.  Torque properly before first use of the machine and every 2-4 hours of use until you are sure bolts are 

staying tight. 

4.  The chart below is a guide for proper torque.  Use it unless a specified torque is called out elsewhere 

in the manual. 

5.  Torque is the force you apply to the wrench handle or the cheater bar, times the length of the handle 

or bar. 

6.  Use a torque wrench whenever possible. 

 
The following table shows torque in ft. lbs. 
 
 

 
 
 

Summary of Contents for 2967-180B

Page 1: ...JECTION COULTER OPERATOR S INSTRUCTION MANUAL W PARTS IDENTIFICATION 2565 483_REV_E 06 2021 YETTER MANUFACTURING CO FOUNDED 1930 Colchester IL 62326 0358 Toll free 800 447 5777 309 776 3222 Fax Websit...

Page 2: ......

Page 3: ...implement before performing service If the machine must be serviced in the raised position jack or block it up to prevent it from accidentally falling and injuring someone Do not allow riders on the...

Page 4: ...TABLE OF CONTENTS FOREWORD 2 SAFETY 3 TABLE OF CONTENTS 4 ASSEMBLY INSTRUCTIONS 5 8 OPERATION 9 MAINTENANCE 10 TROUBLESHOOTING 11 PARTS IDENTIFICATION 12 15...

Page 5: ...tightened bolts will result in damage breakage expense and down time 2 Always replace bolts with the specified grade and type 3 Torque properly before first use of the machine and every 2 4 hours of...

Page 6: ...bly that secures the hub and spindle assembly to the arm Remove the hub and spindle assembly from the coulter arm Insert the 3 8 x 1 bolt through the arm NOTE The head of the bolt should be installed...

Page 7: ...pivot bushings 2967 553 and 5 8 lock hex nut STEP 3 Insert the adjustment pin into the arm and the Adjustment Plate Check the alignment of all the adjustment holes move adjustment plate as needed then...

Page 8: ...due manager arm using 2 3 8 x 3 1 4 bolts 2 spacer bushings and 3 8 lock hex nuts STEP 5 Fasten the R M wheel assemblies to the 2959 206 R M arm using 5 8 lock washers and 5 8 hex nuts Torque 150 ft l...

Page 9: ...gers are designed to move crop residue only 2 DO NOT operate planter at slow speeds ground speed affects how aggressive the spoke wheels are operate at sufficient speed 4 6 mph to maintain good residu...

Page 10: ...hine thoroughly to remove all dirt debris and crop residue which would hold moisture and cause rusting Inspect machine for worn or broken parts See your Yetter Farm Equipment dealer during the off sea...

Page 11: ...important Figure B The planter hitch is set too low while the planter remains at 20 off the ground Notice from the illustration that the unit mounted coulter is running deeper in the ground Note Both...

Page 12: ...PARTS IDENTIFICATION...

Page 13: ...PARTS IDENTIFICATION...

Page 14: ...PARTS IDENTIFICATION 2966 140 ST FW 2966 140 BW FW...

Page 15: ...PARTS IDENTIFICATION 2966 141 FW...

Page 16: ...2565 483_REV_E 06 2021...

Reviews: