background image

5

GB

O R I G I N A L   I N S T R U C T I O N S

TECHNICAL DATA 

Catalogue number

Unit of measurement   

YT-5890

YT-5892

YT-5893

YT-5894

Maximum load           

[kg]

500

1000

2000

3000

Maximum lifting height

[m]

2,5

2,5

2,5

2,5

Maximum height of installation of the winch      

[m]

2,7

2,7

2,7

2,7

Number of load chains       

1

1

2

2

Size of the links of the loading chain

[mm]

5 x 18

6 x 18

6 x 18

8 x 24

Mass [kg]

6

9

12

22

Temperature of the surrounding 

[

O

C]

0 - 40

0 - 40

0 - 40

0 - 40

DESCRIPTION OF THE PRODUCT

The chain winch has been designed to lift loads. It must not be used as a tensioning element installed permanently or for other 

purposes.

SAFETY RECOMMENDATIONS   

The winch is a mechanical device which works under heavy loads. During work with the machine observe the following safety 

recommendations.

Before you proceed to work with the machine, read the instructions carefully and keep them. 

The winch must not be used to transport people or animals.

Check the conditions of the chain. In case broken or distorted links are detected, it is prohibited to continue working. The chain 

must be replaced for a new one; in order to have it done contact an authorised service centre.

During work with the winch the chains must not be in contact at any point with sharp edges, e.g. corners.

Do not fix the transported loads wrapping them with the chain and engaging the hook on the chain. 

Do not overload the winch. Observe the maximum load specified on the rating plate of the winch.

During a prolonged lowering of loads there is a risk of overheating of the braking system. 

Do not leave a hanging load unattended. Make sure children and unqualified persons do not have access to the area of operation 

or storage of the winch.

Do not use the winch if the chain is tangled. First untangle the links.

Do not lift the load too high or lower it too low.

Make sure that all the elements (such as hooks, hook eyes, etc.), to which the winch is to be connected, will resist the load gener-

ated during operation of the winch.

It is prohibited to use the winch for any other purpose than for lifting loads.

It is required that during operation of the winch the operator observe at all times the transported load. Make sure particularly that 

there are no people or animals along the route of the transported load.

It is prohibited to walk or stay under  the transported load.

Do not allow the transported load to swing. 

Do not use excessive force while lifting the loads, and particularly do not pull the chain. If lifting is difficult and resistance is felt, 

stop the operation and send the winch for an overhaul. 

Do not wear loose clothes or jewellery. Gather long hair.

Use individual protection means such as  helmets, protective goggles, gloves, as well as appropriate protective shoes.

If the winch requires repair, contact an authorised service centre. 

Be prudent, do not work while you are tired or under influence of medicine.

OPERATION OF THE WINCH

Transport of a load

Engage the fixed hook to the eye of an appropriate resistance. Make sure the lower point of the loop of the control chain will be 

within 500 mm to 1000 mm from  the floor. Shorten the control chain, if necessary. It has a special link of a distinct colour; shorten-

ing must be done in  an authorised service centre.  

Engage the load to the mobile hook.

Tension the chain and make sure it is not tangled or twisted. 

Moving the chain in an adequate direction, transport the load.

MAINTENANCE

The winch must be protected from humidity. Do not expose it to adverse atmospheric conditions, particularly to precipitation. Do 

Summary of Contents for YT-5890

Page 1: ...PL DE RUS LV HU E RO CZ UA LT SK WYCI GARKA A CUCHOWA CHAIN BLOCK KETTENWINDE GRANDININ GERV U IEVILK ANAS IER CE ET ZOV KLADKOSTROJ RE AZOV KLADKOSTROJ L NCOS CS RL EXTRACTOR CU LAN MONTACARGAS DE C...

Page 2: ...adunkowy 5 a cuch steruj cy PL 1 Unbeweglicher Haken 2 Beweglicher Haken 3 Geh use 4 Lastenkette 5 Steuerkette DE 1 fixed hook 2 mobile hook 3 casing 4 load chain 5 control chain GB TOYA S A ul So tys...

Page 3: ...obs udze urz dzenia Nie u ywa wyci garki w przypadku gdy a cuch jest spl tany Najpierw rozpl ta spl tane ogniwa Nie nale y podnosi adunku zbyt wysoko albo opuszcza go zbyt nisko Nale y si upewni e ws...

Page 4: ...garki naprawia samodzielnie nale y stosowa tylko oryginalne cz ci zamienne Zapewni to w a ciwe bezpiecze stwo u ytkowania Przynajmniej raz na trzy miesi ce nale y nasmarowa a cuch adunkowy i steruj c...

Page 5: ...on or storage of the winch Do not use the winch if the chain is tangled First untangle the links Do not lift the load too high or lower it too low Make sure that all the elements such as hooks hook ey...

Page 6: ...the original spare parts It will guarantee safety of operation Lubricate the load and the control chain at least once in three months It will protect the chains from corrosion Apply a small amount of...

Page 7: ...wie in der Bedienung ungeschulte Personen in die N he gelassen werden Die Winde darf nicht genutzt werden wenn sich die Kette verwickelt hat Zuerst sind die mit einander verwickelten Kettenglieder aus...

Page 8: ...sch digungen festge stellt dann ist der Einsatz der Winde strengstens verboten In solch einem Fall muss man die Winde an eine autorisierte Servicewerkstatt bergeben Die Winde darf nicht selbst reparie...

Page 9: ...9 RUS YT 5890 YT 5892 YT 5893 YT 5894 500 1000 2000 3000 2 5 2 5 2 5 2 5 2 7 2 7 2 7 2 7 1 1 2 2 5 x 18 6 x 18 6 x 18 8 x 24 Ma a 6 9 12 22 O C 0 40 0 40 0 40 0 40 O O 500 o 1000...

Page 10: ...10 RUS KO...

Page 11: ...11 UA YT 5890 YT 5892 YT 5893 YT 5894 500 1000 2000 3000 2 5 2 5 2 5 2 5 Ma 2 7 2 7 2 7 2 7 1 1 2 2 5 x 18 6 x 18 6 x 18 8 x 24 Ma a 6 9 12 22 Te O C 0 40 0 40 0 40 0 40 O O 500 o 1000...

Page 12: ...12 UA...

Page 13: ...ti krovinio pernelyg auk tai ir taip pat nenuleisti jo pernelyg emai Reikia sitikinti kad visi elementai tokie kaip kabliai u kabinimai ir pan prie kuri gerv bus pritvirtinta i laikys susidaran i gerv...

Page 14: ...tinkam gerv s vartojimo saugum Bent kart kas tris m nesius reikia patepti krovinin ir valdymo grandines Tai apsaugos grandines nuo korozijos Tuo tikslu reikia sudr kinta nedideliu skysto tepalo kieki...

Page 15: ...gad jum kad de ir samezglota Pirmk rt j at etina des posmus Nedr kst pacelt kr vu p r k augsti vai nolaist p r k zemi Ir nepiecie ami p rbaud t vai visi elementi i tur t ji utt pie kuriem b s pievien...

Page 16: ...s da u Tas at aus nodro in t lieto anas dro bu Vismaz vienu reizi ik p c trim m ne iem noe ot iekrau anas un vad anas di Tas at aus pasarg t di no korozijas Lai to dar t uz lupatu uzlikt idras sm rvie...

Page 17: ...ba nejprve rozpl st B emeno se nesm zvedat p li vysoko nebo spou t t p li n zko Je t eba se ujistit zda v echny nosn prvky h ky z v sy a pod ke kter m bude kladkostroj p ipojen vydr zat en vyskytuj c...

Page 18: ...gin ln n hradn d ly T m je garantov na provozn bezpe nost Zvedac a ovl dac et z nejm n jednou za t i m s ce nama te et z tak bude chr n n p ed koroz K tomuto elu je t eba nan st na hadr p im en mno st...

Page 19: ...roj nepou vajte Spleten l nky je potrebn najprv rozplies Bremeno sa nesmie zdv ha pr li vysoko alebo sp a pr li n zko Je potrebn sa uisti i v etky nosn prvky h ky z vesy a pod ku ktor m bude kladkostr...

Page 20: ...sm pou va iba origin lne n hradn diely Garantuje sa t m prev dzkov bezpe nos Zdv haciu a ovl daciu re az najmenej raz za tri mesiace nama te Re az tak bude chr nen pred kor ziou Za t mto elom naneste...

Page 21: ...kell bogozni a l ncot Nem szabad a terhet t l magasra emelni vagy t l m lyre leengedni Meg kell gy z dni r la hogy minden elem mint a horgok kamp k stb amelyekhez a cs rl hozz lesz k tve kib rj k a c...

Page 22: ...a biztons gos m k d s t Legal bb h romhavonta meg kell kenni a teheremel s a mozgat l ncot Ez v di a l ncokat a korr zi ellen Ehhez egy rongyra egy kev s ken anyagot kell tenni s a l ncokat eg sz hoss...

Page 23: ...a i extractorul n cazul n care lan ul este ncurcat Mai nt i trebuie sa descurca i lan ul Nu trebuie sa ridica i nc rc tura prea sus sau sa o cobora i prea puternic Trebuie sa va asigura i ca toate ele...

Page 24: ...repararea individuala a extractorului trebuie utilizate doar piese de schimb originale Acest lucru asigura siguran a corespunz toare a utiliz rii Cel pu in o data la trei luni trebuie sa unge i lan ul...

Page 25: ...trabajo o almacenamiento del montacargas a ni os y personas sin capacitaci n para la operaci n de la m quina No use el montacargas si la cadena est enredada Primero desenrede los eslabones No se debe...

Page 26: ...montacargas por s mismo se deben usar solamente refacciones originales lo cual garantizar la seguridad del trabajo con la m quina Al menos una vez en tres meses es menester lubricar la cadena de carga...

Page 27: ...r kat YT 5892 Wciagarka a cuchowa 2000 kg 2 5 m 6 x 18 mm WLL 2000 kg nr kat YT 5893 Wciagarka a cuchowa 3000 kg 2 5 m 8 x 24 mm WLL 3000 kg nr kat YT 5894 do kt rych odnosi si niniejsza deklaracja s...

Page 28: ...I N S T R U K C J A O R Y G I N A L N A 28...

Reviews: