9 Maintenance and Inspection
9.3 Notes on Grease Replenishment/Exchange Procedures
9-13
155556-1CD
HW0484963
VA1400
7. Wipe the discharged grease with a cloth, and reinstall the plug. Before
installing the screw, apply Three Bond 1206C on the thread part of the
plug, then tighten the plug with a tightening torque of 10 N•m
(1.0 kgf•m).
9.3.3.2 Grease
Exchange
(Refer to
Fig. 9-6 “E-Axis Speed Reducer Diagram”
.)
1. Remove the hexagon shead plug PT1/8 from the grease exhaust port.
2. Remove the hexagon socket head cap plug PT1/8 from the grease
inlet.
3. Install a grease zerk PT1/8 to the grease inlet. (The grease zerk is
delivered with the manipulator.)
4. Inject grease througn the grease inlet using a grease gun.
– Grease type:
VIGO Grease RE No. 0
– Amount of grease:
approx. 300 cc
– Air supply pressure of grease pump: 0.3 MPa or less
– Grease injection rate:
8 g/s or less
5. The grease exchange is complete when new grease appears in the
grease exhaust port. (The new grease can be distinguished from the
old grease by color.)
6. Move the E-axis for a few minutes to discharge excess grease.
7. Remove the grease zerk from the grease inlet, and reinstall the plug.
Before installing the plug, apply Three Bond 1206C on the thread part
of the plug, then tighten the plug with a tightening torque of 4.9 N•m
(0.5 kgf•m).
8. Wipe the discharged grease with a cloth, and reinstall the plug to the
grease exhaust port. Before installing the plug, apply Three Bond
1206C on the thread part of the plug, then tighten the plug with a
tightening torque of 10 N•m (1.0 kgf•m).
NOTE
• If grease is injected with the plug on, the grease will leak
inside the motor and may cause a damage. Make sure to
remove the plug before the grease injection.
• Do not install a joint, a hose, etc. to the grease exhaust
port. Failure to observe this instruction may result in
damage to the motor due to coming off of an oil seal.
58 of 85