Maintenance and inspection
9
-
47
9
Maintenance and inspection
DANGER!
Danger to life due to electric shock
Maintenance and inspections must be performed by specified personnel.
The instructions given below must be followed before taking maintenance and inspection
measures:
Turn OFF the main power supply.
Put up the required warning sign, e.g
"Do not turn the power on!"
.
Install a switch-on guard as prescribed.
If you have any questions regarding disassembly or repair, please contact the local
YASKAWA branch office.
NOTICE
Home position data is lost
Before removing the connector of the encoder cable to perform maintenance or inspection,
Connect the spare battery unit.
Summary of Contents for GP25-12
Page 1: ...ROBOTICS YYR 1 06VXH25 A10 GP25 12 Standard Operating and Maintenance Manual...
Page 51: ...Maintenance and inspection 9 51 Fig 9 2 Inspection intervals...
Page 56: ...Maintenance and inspection 9 56 9 3 Wrist unit Sealing part U arm Cover Gasket U arm 1 2 3...
Page 77: ...Parts lists 11 77...