![background image](http://html1.mh-extra.com/html/yardmaster/1020/1020_manual_3191086019.webp)
18
BACK SECTION ASSEMBLY.
1.
Overlap and attach two back base rails; 41101, to back intermediate base rail; 41104, on inside of
either end of 41104 using screws (bag 1).
2.
Fix 2 standard uprights; 41301, as shown to centre of back base rail overlaps using screws (bag 2)
and spire nuts (bag 10).
ASSEMBLAGE DE LA STRUCTURE ARRIERE
1.
SUPERPOSER ET FIXER AUX DEUX POUTRES RENFORCEES 41101 LE RAIL DE BASE 41104,
A L'AIDE DE LA VISSERIE DE LA POCHETTE NO. 1.
2.
FIXER LES DEUX PROFILES D'ANGLE 41301 COMME INDIQUE CI-DESSOUS AU CENTRE DU
RAIL DE BASE, A L'AIDE DE LA VISSERIE DE LA POCHETTE NO. 2 ET DES ECROUS DE LA
POCHETTE NO. 10.
Summary of Contents for 1020
Page 2: ...1...
Page 3: ...2...
Page 4: ...3...
Page 5: ...4...
Page 6: ...5...
Page 7: ...6...
Page 8: ...7...
Page 9: ...8 M8x19mm x 13 13...
Page 10: ...9...
Page 11: ...10 7mm Holes Trous...
Page 16: ...15 Recouvrement...
Page 18: ...17...
Page 20: ...19...
Page 23: ...22...
Page 24: ...23...
Page 26: ...25 OUTSIDE EXTERIEUR...
Page 27: ...26 OUTSIDE EXTERIEUR...
Page 29: ...28 OUTSIDE EXTERIEUR...
Page 30: ...29 OUTSIDE EXTERIEUR...
Page 32: ...31...
Page 33: ...32...
Page 35: ...34...
Page 37: ...36...
Page 38: ...37...
Page 40: ...39...
Page 42: ...40 41...
Page 44: ...42 43...
Page 47: ...45 46...
Page 48: ...46 47...