![background image](http://html1.mh-extra.com/html/yardcraft/titan-playset/titan-playset_assembly-manual_3181543013.webp)
Step 38.
Locate the 56” 2x6 with vinyl caps on both ends and fasten it to
the bottom of the 128” 4x4 posts.
Use 6 7/8” threaded rods to fasten it then tighten the rest of the
threaded rods on the playset.
Step 37.
Install the 2x6 corner brackets and fasten the rods using acorn
nuts and washers.
Fasten the top and bottom of the brackets using 1 3/4” washer
head screws.
Step 40.
Fasten them using 1 3/4” washer head screws.
Step 39.
Place three 56” 2x4 floor joists (1N) in the joist hangers.