![background image](http://html1.mh-extra.com/html/yardcraft/fairmont-garden-shed/fairmont-garden-shed_assembly-instructions-manual_3171936005.webp)
Note: When attaching sheeting to
floor joists, match this pattern.
Note: It is important for sheeting to
remain flush with edges of subfloor
as shown.
Continue attaching sheeting to edge of sub-floor making sure to keep the
edges flush. Space nails 8-10” apart.
Attach sheeting to subfoor at corner
of subfloor.
Begin with front corner sheeting
piece.
Continue until sub-floor is complete
as shown.
Before proceeding, ensure sub-floor is square. Sub-
floor is square when corner to corner diagonal mea
-
surements are equal.
Install Flooring