![background image](http://html1.mh-extra.com/html/yardcraft/fairmont-garden-shed/fairmont-garden-shed_assembly-instructions-manual_3171936010.webp)
Repeat previous steps on opposite end of wall, so both walls are flush
with wall framing.
If wall isn’t flush with edge of floor,
you may be able to move it slight-
ly hitting firmly with hammer at
bottom edge.
Pull wall and siding tightly against
floor and attach bottom plate to
floor using 3” screws.
Next repeat previous steps at oppo-
site corner.
Cut overhanging siding so siding is
flush with wall framing.
Lift and set wall, making sure edges of wall are flush with edges of floor.
Note: It is very important that one person is holding with wall in
place until wall is attached firmly to floor.
Note the bottom of siding should
overhang past edge of floor and
edge of wall should be flush with
edge of floor.
Note: See other steps and before
moving to step...
Align a chalk line with edges of wall framing and snap a line.