![background image](http://html1.mh-extra.com/html/yardcraft/fairmont-garden-shed/fairmont-garden-shed_assembly-instructions-manual_3171936020.webp)
Locate gable framing 2x4 and align with splice in siding.
Attach gable framing to wall top plate.
Attach siding to gable framing.
Repeat steps at each siding splice.
Align flush with edge of rafter.
Attach end rafter to overhang framing using 3” screws spaced 8-12” apart
and work to peak of roof.
Use 3” screws to attach framing
board to rafter.
Locate gable overhang sections.
There is a front and back section.
Slide gable overhang on top of end
rafter.