Once the device has docked, the symbol S1 and S2 will start flashing. This indicates that the
battery is charging correctly.
After initial installation, the Robotic Mower will remain in the docking station until the battery is
fully charged.
Successful docking and charging indicates that you have found a suitable position for the docking
station. You should now drive fixing pegs into ground fully.
Take care not to damage or kink the surplus wire stored under the docking station.
Signal selection
Note:
the default signal is S1, no need to change the signal when there isn’t ainfluence signal
form the neighbors.
If your neighbour is using the samer, will need to keep a distance of 0.5 m between you and your
neighbour's boundary wires to prevent the two devices interfering with each other. Ensure to
position your docking station at least 10 m away from your neighbour's boundary wires and that
both products are using different signals. Please refer to section "Signal setting" in order to select
signal S1 or S2 for your installation.
1.
Press the “signal” button on the charging station, the indicator will be switched to S2.
Turn on the robotic lawnmower, use the boundary selection button on the control panel
2.
,
Garage installation
After the docking station is fixed in the lawn, then please install the garage with the docking station.
Please follow below instructions, please find the clips position under the garage and the
choose the boundary wire signal to S2.
corresponding parts on the top of docking station column.
GB
GB
8
9
GB
GB
S1
S2
S1
S2
S1
S2
>10 m
>10 m
>0.5 m
S1
S2
1
2
1
2
3
4