12 | RMB/ENERGIE GmbH
Installation and commissioning
Manual neoTower
®
Power Storage | (02/2022)
►
Make the following settings (value table) for the BOS on the screen of the CHP unit:
neoTower
®
Min. SoC
(unless there is a power failure)
Max. SoC for release of the CHP
(standalone operation)
BOS 18 BOS 21 BOS 36 BOS 57
BOS
114
BOS
18
BOS
21
BOS
36
BOS
57
BOS
114
BOS
114
2.0
min. 10% / max. 100%
min. 20% / max. 80%
3.3
4.0
5.0
7.2
9.5
11.0
12.5
16.0
20.0
25.0
30.0
50.0