RMB/ENERGIE GmbH | 13
Installation and commissioning
Manual neoTower
®
Power Storage | (02/2022)
neoTower
®
Max. power per phase to start the CHP (standalone
operation)
Power specifications, mains
network supply
BOS 18
BOS 21
BOS 36
BOS 57
BOS 114
BOS
18
BOS
21
BOS
36
BOS
57
BOS
114
2.0
<= 800 W
n/a
n/a
n/a
n/a
As a rule "0W”
3.3
max.
inverter, as
starter
max.
inverter, as
starter
max.
inverter, as
starter
max.
inverter, as
starter
max.
inverter, as
starter
4.0
5.0
/
/
n/a
n/a
n/a
7.2
/
/
9.5
/
max.
inverter, as
starter
max.
inverter, as
starter
max.
inverter, as
starter
max.
inverter, as
starter
11.0
/
/
/
n/a
n/a
12.5
/
/
max.
inverter, as
starter
max.
inverter, as
starter
max.
inverter, as
starter
16.0
/
/
/
n/a
n/a
20.0
/
/
/
25.0
/
/
/
max.
inverter, as
starter
max.
inverter, as
starter
30.0
/
/
/
50.0
/
/
/
/