Yangzhou Shenzhou Wind-driven Generator Co.,Ltd
URL: www.f-n.cn
3kw, there needs to be three screw tooth hole forwards to the front side.
Placing the concrete after making the basement ready
(
C25
)
,
as below,
Put the edge anchor into the edge basement, and please check the
distance between the hook of basement and the center, including the
basic level of basement, and then placing concrete. Do as below,