Yangzhou Shenzhou Wind-driven Generator Co.,Ltd
URL: www.f-n.cn
4.4 Assembly generator
1. Connect the cable to the bottom of generator, and then make the
cable go through the pole center.
For E1KW/E2KW/E3KW:
Terminal No.1 and No.2 connect with temperature;
Terminal No.3, No.4 and No.5 connect with wind generator power cable.
E5KW: