down the generator slowly to the yoke.
【
If using a tractor or winch
】
First, release the steel wire of the basement,
and then connect the steel wire to tractor or winch according to the
installing manner by reversing it. Finally, lay down the tower on the yoke
slowly.
6 Battery Configuration
Battery should be placed in a dry building with constant temperature
and ventilation area. By calculating the output of generator, you could
decide the number of the battery and the connection, series and parallel.
Then please design a cage for placing the battery, controller and inverter.
To avoid electromagnetic interference, after connect the battery, please
smear the end of wire with grease or anti-corrosion material. The
connecting wire between battery and controller should be no less than
3M. You could check the parameter for choosing the battery.
Series connecting is to connect the anode of one battery to the cathode
of another battery as below,