
–29–
A Make sure the headlight lead in the rubber cover.
B Route the horn lead over the horn bracket and
make sure that the lead has no slack.
C Do not cross the throttle cables and right handlebar
switch lead.
D Route the thermo switch lead through the steel
band on the radiator.
E Fasten the main harness and thermo switch lead
with a plastic clamp. Insert the plastic clamp into
the hole on the frame.
F Route the ignition coil sub-wire harness under the
throttle position sensor.
G To the carburetor.
H Route the coolant reservoir tank breather hose up-
per the air vent surge tank.
I Fasten the wire harness and ignition coil subwire
harness with a plastic clamp.
J Route the idle adjust cable upper the ground lead.
K Fasten the fuel pump lead, speed sensor lead,
neutral switch lead, rear brake light lead, fuel send-
er lead, starter motor lead and EXUP cable with a
plastic clamp.
CABLE ROUTING
SPEC
Summary of Contents for YZF-R1 2000
Page 1: ......
Page 2: ......
Page 23: ... 15 1 Exhaust camshaft 2 Intake camshaft 3 Oil filter OIL FLOW DIAGRAMS SPEC ...
Page 24: ... 16 1 Cylinder head 2 Crankshaft OIL FLOW DIAGRAMS SPEC ...
Page 26: ... 18 1 Thermostat housing 2 Water pump 3 Radiator 4 Radiator fan COOLANT FLOW DIAGRAMS SPEC ...
Page 27: ... 19 1 Radiator 2 Thermo unit COOLANT FLOW DIAGRAMS SPEC ...
Page 76: ......