–21–
N Route the thermo switch / temperature sender sub-
wire harness to the outside of the radiator cap.
O Route the right handlebar switch lead behind the
throttle cables. Do not cross the throttle cables and
the right handlebar switch lead.
P Route the right handlebar switch lead in front of the
throttle cables.
G Fasten the headlight lead with a plastic clamp at
white tape mark.
H Fasten the wire harness to the headlight housing
boss with a plastic locking tie.
I Route the headlight lead through the plastic guide.
J Route the throttle cable to the front side of the brake
hose.
K Route the clutch cable behind the front fork leg.
L Make sure that the horn leads face out.
M Route the throttle cables and right handlebar
switch lead between the lower bracket and steering
cover.
CABLE ROUTING
SPEC
Summary of Contents for YZF-R1 2000
Page 1: ......
Page 2: ......
Page 23: ... 15 1 Exhaust camshaft 2 Intake camshaft 3 Oil filter OIL FLOW DIAGRAMS SPEC ...
Page 24: ... 16 1 Cylinder head 2 Crankshaft OIL FLOW DIAGRAMS SPEC ...
Page 26: ... 18 1 Thermostat housing 2 Water pump 3 Radiator 4 Radiator fan COOLANT FLOW DIAGRAMS SPEC ...
Page 27: ... 19 1 Radiator 2 Thermo unit COOLANT FLOW DIAGRAMS SPEC ...
Page 76: ......